Suggestions appear as you type. Use the up and down arrows to choose one and Enter to open it.

This page's audience our own tag's counts — open to see them
–Visits
–Page views
–Clicks to vendors
–Time on page
–Reading now
Clicks to vendors, by tool
  • –
Top countries
  • –
Devices
  • –

– · visits, page views and clicks counted by our own tag, which counts more than our checked analytics; every figure rounded down · how we count

Best Asta Powerproject Alternatives in 2026

#14 of 46 in Gantt Chart SoftwareConstruction Scheduling SoftwareProject Planning Software

The top Asta Powerproject alternatives are Oracle Primavera Cloud, Primavera P6 Professional and Autodesk Forma Schedule: 15 gantt chart software our editors would look at instead of Asta Powerproject, in our ranking order.

7.9/10Editor score
Asta Powerproject7.9 Visit site

Asta Powerproject: A deep scheduling system for construction teams that need detailed cost and risk control. Where it falls short: starting price is £695 per user per year.

Switching from Asta Powerproject? For most gantt chart software buyers the best Asta Powerproject alternative is Oracle Primavera Cloud, built for large capital programs and risk-heavy planning. On a budget, GanttPRO starts at $7/user/mo. ProjectLibre has a free plan.

Why People Look for an Asta Powerproject Alternative

  • Starting price is £695 per user per year
  • No free plan is available
  • The listed subscription is installed on one Windows PC

Quick Picks by What You Need

All 15 Asta Powerproject Alternatives, Ranked

Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.

  1. Best forLarge capital programs and risk-heavy planning

    • Better than Asta Powerproject:
    • Editor score 9.3 vs 7.9

    A broad planning suite for capital programs that need scheduling, risk, resources, and portfolios.

    9.3/10★★★★★
    Visit Oracle
  2. Best forEnterprise teams managing complex project schedules

    • Better than Asta Powerproject:
    • Editor score 9.2 vs 7.9

    CPM scheduling and multi-project controls for teams that can work within a Windows desktop setup.

    • Critical path
    9.2/10★★★★★
    Visit Oracle
  3. Best forConstruction teams coordinating field schedules

    • Better than Asta Powerproject:
    • Editor score 9.1 vs 7.9

    Construction scheduling with Gantt views, version comparisons, and weekly work plans.

    • Critical path
    9.1/10★★★★★
    Visit Autodesk
  4. Best forMicrosoft ecosystem and enterprise workflows

    • Better than Asta Powerproject:
    • Editor score 9.0 vs 7.9

    A Microsoft-centered Gantt option for structured schedules, resources, and reporting.

    9.0/10★★★★☆
    Visit site
  5. Best forFree, deep scheduling and multi-project control

    • Better than Asta Powerproject:
    • Editor score 8.9 vs 7.9

    A deep scheduling tool with free desktop access and paid cloud collaboration.

    Free plan · 7-day trial Our ProjectLibre verdict → Visit ProjectLibre
    8.9/10★★★★☆
    Visit ProjectLibre
  6. Best forFree desktop scheduling with open-source flexibility

    • Better than Asta Powerproject:
    • Editor score 8.8 vs 7.9

    A capable open-source scheduler for offline planning, with narrower collaboration options.

    8.8/10★★★★☆
    Visit GanttProject
  7. TeamGantt

    Best forCollaborative teams needing many project views

    • Better than Asta Powerproject:
    • Editor score 8.6 vs 7.9

    A flexible Gantt workspace for teams managing schedules, workloads, and collaboration.

    Free plan · 14-day trial Our TeamGantt verdict → Visit TeamGantt
    8.6/10★★★★☆
    Visit TeamGantt
  8. GanttPRO

    Best forTeams wanting broad, affordable project management

    • Better than Asta Powerproject:
    • Editor score 8.5 vs 7.9

    Broad project planning with Gantt, workload, time tracking, and collaboration tools.

    8.5/10★★★★☆
    Visit GanttPRO
  9. Best forMicrosoft Project-compatible teams across devices

    • Better than Asta Powerproject:
    • Editor score 8.4 vs 7.9

    A capable Microsoft Project-compatible planner for teams working across devices.

    Free plan · 14-day trial Our Project Plan 365 verdict → Try Project Plan 365
    8.4/10★★★★☆
    Try Project Plan 365
  10. Best forTeams needing configurable scheduling and resource planning

    • Better than Asta Powerproject:
    • Editor score 8.3 vs 7.9

    Configurable Gantt scheduling with resource planning across cloud, desktop, and mobile.

    • Baseline tracking
    • Workload view
    • Resource management
    8.3/10★★★★☆
    See Visual Planning
  11. Ganttic

    Best forTeams coordinating projects and shared resources

    • Better than Asta Powerproject:
    • Editor score 8.2 vs 7.9

    Gantt scheduling, workload tracking and calendar sync for resource planners.

    Free plan · 14-day trial Our Ganttic verdict → Visit Ganttic
    8.2/10★★★★☆
    Visit Ganttic
  12. OmniPlan

    Best forMac and iOS users needing advanced scheduling

    • Better than Asta Powerproject:
    • Editor score 8.1 vs 7.9

    A deep scheduling tool for Apple users who need dependencies, resources, and forecasting.

    • Baseline tracking
    • Workload view
    • Resource management
    8.1/10★★★★☆
    Visit OmniPlan
  13. Best forDesktop users wanting a one-time purchase

    • Better than Asta Powerproject:
    • Editor score 8.0 vs 7.9

    A feature-rich desktop planner for buyers who prefer a one-time license.

    • Baseline tracking
    • Workload view
    • Resource management
    8.0/10★★★★☆
    Visit ConceptDraw
  14. Best forDesktop users needing cost and portfolio controls

    A capable paid choice for desktop project planning, budgets, resources, and portfolios.

    7.9/10★★★★☆
    Visit RationalPlan
  15. Best forApple-based teams needing rich project planning

    A deep Apple-focused planner for teams that need more than basic Gantt charts.

    7.8/10★★★★☆
    Visit Merlin Project

Asta Powerproject Alternatives: Common Questions

What is the best alternative to Asta Powerproject?

Oracle Primavera Cloud: #1 in our Gantt Chart Software ranking, with an editor score of 9.3 out of 10. A broad planning suite for capital programs that need scheduling, risk, resources, and portfolios.

Is there a free alternative to Asta Powerproject?

Yes. ProjectLibre, GanttProject, TeamGantt, Project Plan 365 and Ganttic have a free plan or a free tier.

What is the cheapest paid alternative to Asta Powerproject?

Of the alternatives here that publish a price, GanttPRO starts lowest, at $7/user/mo.

Why do people look for Asta Powerproject alternatives?

Starting price is £695 per user per year; No free plan is available; The listed subscription is installed on one Windows PC.

How do I switch from Asta Powerproject?

Export your data from Asta Powerproject (most tools have an export in their settings). Sign up for the alternative; start on its free plan or trial if it has one. Import your export and set up the integrations your team relies on. Run both side by side for a short while, then cancel Asta Powerproject.

How to Switch from Asta Powerproject

  1. Export your data from Asta Powerproject (most tools have an export in their settings).
  2. Sign up for the alternative; start on its free plan or trial if it has one.
  3. Import your export and set up the integrations your team relies on.
  4. Run both side by side for a short while, then cancel Asta Powerproject.

Asta Powerproject vs Each Alternative

#ToolFree planPaid fromScore
14Asta Powerproject£695/user/yr7.9
1Oracle Primavera Cloud9.3
2Primavera P6 Professional9.2
3Autodesk Forma Schedule9.1
4Microsoft ProjectNo9.0
5ProjectLibreYes$9.99/user/mo8.9
6GanttProjectYesFree8.8
7TeamGanttYes8.6
8GanttPRONo$7/user/mo8.5
9Project Plan 365Yes$9.99/user/mo8.4
10Visual PlanningNo$15/user/mo8.3
11GantticYes$25/mo8.2
12OmniPlanNo$199.99/yr8.1
13ConceptDraw PROJECTNo$299/user one-time8.0
14RationalPlan7.9
15Merlin ProjectNo$99.99/user/yr7.8

Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026

Last updated · How we research and update