Asta Powerproject
Asta Powerproject: A deep scheduling system for construction teams that need detailed cost and risk control. Ranked #14 of 46 in Gantt Chart Software by our editors (7.9/10); pricing: Paid; best for construction and enterprise-grade schedule control.
At a glance
- Editor score7.9 / 10
- PricingPaid
- Best forConstruction and enterprise-grade schedule control
- Paid from£695/user/yr
- Task dependenciesYes
- Facts checked20 Sep 2026

Where it wins
- Critical-path analysis, task linking, and unlimited baselines
- Resource, cost, budget, and earned-value tracking
- Scenario modelling, risk analysis, and professional integrations
Where it doesn't
- Starting price is £695 per user per year
- No free plan is available
- The listed subscription is installed on one Windows PC
Our verdict on Asta Powerproject
Asta Powerproject is construction project management software for planning, scheduling, tracking, and managing work from small construction projects to large programmes. Its Gantt-based planning combines task linking, critical-path analysis, milestones, resource allocation, cost tracking, progress monitoring, and reporting. It is suited to construction teams, planners, project managers, and enterprise programmes that need detailed control over schedules, resources, budgets, and project changes.
The published Single user subscription costs £695 per user per year, billed annually, and is installed onto a single Windows PC. The UK-facing price excludes VAT. The product’s scheduling depth extends beyond basic timeline planning: users can work with unlimited baselines, progress periods, resource availability checks, planned and actual costs, earned value, schedule quality checks, and risk analysis. Scenario or “what-if” modelling supports comparison of possible project approaches, while customisable views, filters, codes, annotations, and reports support different planning and reporting needs. There is no free plan, so the cost is easier to justify for professional scheduling requirements than for occasional or lightweight planning.
Asta Powerproject also fits established professional environments through integrations with Microsoft Project, Oracle Primavera, Bidcon, enterprise resource planning systems, BIM tools, Microsoft Office, and OLE automation. Its positioning spans standalone desktop use, SaaS access, and enterprise collaboration, with web and Windows platforms listed. That breadth makes it a strong choice for construction organisations managing complex programmes, resource constraints, cost controls, and formal schedule reviews. Smaller teams seeking a low-cost, simple Gantt tool should choose an alternative, particularly if they do not need critical-path analysis, earned-value tracking, risk analysis, or integration with professional project systems.
Your product? Our editors can test Asta Powerproject in depth and publish a review, labelled as paid · from $149/mo →
Asta Powerproject pricing
All 1 Asta Powerproject plans and prices →
Asta Powerproject fact sheet
| Free plan | Not verified |
|---|---|
| Paid from | £695/user/yr |
| Task dependencies | Yes |
| Milestones | Yes |
| Critical path | Yes |
| Baseline tracking | Yes |
| Resource management | Yes |
| Workload view | Yes |
| Deployment | Cloud, Desktop |
| Platforms | Web, Windows |
| Support | Email, Phone, Docs |
| Built for | Small business, Mid-market, Enterprise (editorial estimate) |
| Integrations | 7 integrations: Microsoft Project, Oracle Primavera, Bidcon, Enterprise Resource Planning systems, BIM tools, Microsoft Office … |
| Pricing | Paid (source) |
| Website | elecosoft.com |
| Facts checked | 20 Sep 2026 |
Asta Powerproject integrations
Asta Powerproject lists 7 integrations on its own site.
- Microsoft Project
- Oracle Primavera
- Bidcon
- Enterprise Resource Planning systems
- BIM tools
- Microsoft Office
- OLE automation
Alternatives to Asta Powerproject
- Oracle Primavera CloudA broad planning suite for capital programs that need scheduling, risk, resources, and portfolios.9.3
- Primavera P6 ProfessionalCPM scheduling and multi-project controls for teams that can work within a Windows desktop setup.9.2
- Autodesk Forma ScheduleConstruction scheduling with Gantt views, version comparisons, and weekly work plans.9.1
See all Asta Powerproject alternatives →
Also Ranked In
Asta Powerproject is ranked in 3 of our directories.
Used Asta Powerproject? Be the first to review it
The editor score above is our own research. What this page doesn't have yet is a reader's view — what you used Asta Powerproject for, what worked and what didn't. No stars are seeded and no review is paid for; an editor reads every one before it appears.
Write a reviewTwo minutes · verified accounts only · read by an editor before it appears
Featured on iTechGuides
Asta Powerproject is listed in our Gantt Chart Software directory. Add the badge to your site — it links back to this page.
<a href="https://www.itechguides.com/products/asta-powerproject-gantt-chart-software/"><img src="https://www.itechguides.com/best/badge/asta-powerproject-gantt-chart-software.svg" alt="Featured on iTechGuides" width="230" height="46"></a>
Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026
Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.
Last updated · How we research and update



