ALICE
ALICE: A construction scheduling platform for teams comparing complex project scenarios. Ranked #4 of 26 in Construction Scheduling Software by our editors (8.8/10); pricing: Pricing on request; best for large teams using AI scenario planning.
At a glance
- Editor score8.8 / 10
- PricingPricing on request
- Best forLarge teams using AI scenario planning
- Critical pathYes
- Founded2015 · Menlo Park, California, United States
- Facts checked22 Sep 2026

Where it wins
- AI-generated what-if scenarios support schedule optimization
- Gantt, longest-path, and resource planning in one platform
- Imports and exports schedules for P6 and Microsoft Project
Where it doesn't
- Pricing is contact-sales rather than publicly itemized
- Web platform only
- No schedule templates are listed among its category capabilities
Our verdict on ALICE
ALICE is an AI-powered construction scheduling and optioneering platform from ALICE Technologies. It is designed for general contractors, owners, and consultants managing large capital construction projects. Teams can create, import, visualize, analyze, and update schedules while modeling constraints, milestones, predecessors, successors, and project resources. Its product range includes Plan, Optimize, and Model, with support for schedule planning, resource allocation, cost modeling, project recovery, and BIM-based workflows.
For complex planning, ALICE combines Gantt views with critical-task and longest-path filters, visual 2D canvas planning, and schedule timelapse playback. Its AI features generate what-if scenarios and support schedule optimization, while the Insights Agent provides LLM-powered schedule analysis. Resource assignment covers crews, workforce, equipment, and materials. Schedule analytics address cost, duration, quality, criticality, and resources, giving large project teams several ways to compare alternatives before updating a plan.
Interoperability is a practical strength for organizations already working with established scheduling systems. ALICE supports schedule import and export for Oracle Primavera P6 and Microsoft Project, and it also connects with Oracle Primavera Cloud. Pricing is handled through contact sales, with published positioning around large capital projects rather than a self-serve plan structure. ALICE should suit teams that need AI-assisted scenario planning alongside detailed scheduling and resource analysis. Smaller teams seeking a straightforward scheduling tool, public plan pricing, or schedule templates may prefer a narrower alternative.
Your product? Our editors can test ALICE in depth and publish a review, labelled as paid · from $149/mo →
ALICE pricing
ALICE fact sheet
| Free plan | Not verified |
|---|---|
| Paid from | Not verified |
| Critical path | Yes |
| Gantt charts | Yes |
| Resource planning | Yes |
| Schedule templates | No |
| Mobile apps | Not verified |
| Project limit | Not verified |
| Deployment | Cloud |
| Platforms | Web |
| Compliance & security | SOC 2, SSO/SAML |
| Support | Community, Docs, Tickets |
| Built for | Mid-market, Enterprise (editorial estimate) |
| Integrations | 3 integrations: Oracle Primavera P6, Oracle Primavera Cloud, Microsoft Project |
| Pricing | Pricing on request (source) |
| Website | alicetechnologies.com |
| Facts checked | 22 Sep 2026 |
ALICE integrations
ALICE lists 3 integrations on its own site.
- Oracle Primavera P6
- Oracle Primavera Cloud
- Microsoft Project
Alternatives to ALICE
- Open Planner StudioA capable free scheduler for construction teams needing CPM, resources, and open file exchange.9.4
- FinitePathAdvanced browser-based scheduling with CPM, resources, cost mapping, and AI insights.9.1
- Asta PowerprojectA deep construction scheduler for teams that need critical paths, resources, costs, and risk analysis.8.9
ALICE vs the competition
- ALICE vs Open Planner Studio
- ALICE vs FinitePath
- ALICE vs Asta Powerproject
- ALICE vs Oracle Primavera Cloud
- ALICE vs GanttAI
- ALICE vs Mastt Schedule
Compare ALICE with any tool side by side →
Used ALICE? Be the first to review it
The editor score above is our own research. What this page doesn't have yet is a reader's view — what you used ALICE for, what worked and what didn't. No stars are seeded and no review is paid for; an editor reads every one before it appears.
Write a reviewTwo minutes · verified accounts only · read by an editor before it appears
Featured on iTechGuides
ALICE is listed in our Construction Scheduling Software directory. Add the badge to your site — it links back to this page.
<a href="https://www.itechguides.com/products/alice-construction-scheduling-software/"><img src="https://www.itechguides.com/best/badge/alice-construction-scheduling-software.svg" alt="Featured on iTechGuides" width="230" height="46"></a>
Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026
Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.
Last updated · How we research and update






