Suggestions appear as you type. Use the up and down arrows to choose one and Enter to open it.

This page's audience our own tag's counts — open to see them
–Visits
–Page views
–Clicks to vendors
–Time on page
–Reading now
Clicks to vendors, by tool
  • –
Top countries
  • –
Devices
  • –

– · visits, page views and clicks counted by our own tag, which counts more than our checked analytics; every figure rounded down · how we count

Head-to-head · Construction Scheduling Software

Open Planner Studio vs ALICE

  • Updated Oct 2026
  • Both researched from official sources
  • 5 checks side by side
Higher score Open Planner Studio #1 in Construction Scheduling Software 9.4/10 Free plan Free plan✓ 3 of 4 features Visit Open Planner
ALICE #4 in Construction Scheduling Software 8.8/10 Pricing on request ✓ 3 of 4 features Visit ALICE

Open Planner Studio leads on 0 checks, ALICE on 0, and 5 are even. Who comes out ahead on the 5 yes/no, price and count checks where we have data for both products. The editor score weighs everything else too.

Our verdict

  • Highest scoreOpen Planner Studio · 9.4/10
  • Free planonly Open Planner Studio

Open Planner Studio scores higher on our rubric for construction scheduling software: 9.4 against 8.8 out of 10; our editors rank them #1 and #4.

Open Planner Studio is the better fit for teams needing free construction scheduling software. ALICE is the better fit for large teams using AI scenario planning.

  • Open Planner Studio fits best

    Teams needing free construction scheduling software

  • ALICE fits best

    Large teams using AI scenario planning

Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.

Side by side

Feature Open Planner Studio 9.4/10 Visit ↗ ALICE 8.8/10 Visit ↗
At a glance
Editor score 9.4 8.8
Ranking #1 in Construction Scheduling Software #4 in Construction Scheduling Software
Best for Teams needing free construction scheduling software Large teams using AI scenario planning
Pricing model Free Paid
Starting price Free Pricing on request
Free plan ✓ (best) Not checked yet
Free trial — —
Deployment Desktop Cloud
Platforms Web, Windows, macOS, Linux Web
Support Docs Community, Docs, Tickets
Integrations 4 integrations 3 integrations
Built for Solo, Small business, Mid-market, Enterprise Mid-market, Enterprise
Features Open Planner Studio 3/4 · ALICE 3/4
Critical path ✓ ✓
Gantt charts ✓ ✓
Resource planning ✓ ✓
Schedule templates Not checked yet —
Specs
Mobile apps None Not checked yet
Project limit Not checked yet Not checked yet
Our review
Pros
  • Free, open-source package with no subscription or per-seat licence fees
  • CPM, float, deadlines, resources, histograms, levelling, and baselines
  • IFC, CSV, MS Project, and Primavera P6 interoperability
  • AI-generated what-if scenarios support schedule optimization
  • Gantt, longest-path, and resource planning in one platform
  • Imports and exports schedules for P6 and Microsoft Project
Cons
  • No mobile apps; access is through the browser or desktop platforms
  • The only named plan is the free, open-source package
  • The built-in AI assistant is described for reading and editing schedules
  • Pricing is contact-sales rather than publicly itemized
  • Web platform only
  • No schedule templates are listed among its category capabilities
Our verdict

Open Planner Studio is an open-source construction planning application for building, infrastructure, and civil-engineering projects. It is aimed at teams that need structured scheduling rather than a basic task list, with interactive…

Read the review →

ALICE is an AI-powered construction scheduling and optioneering platform from ALICE Technologies. It is designed for general contractors, owners, and consultants managing large capital construction projects. Teams can create, import,…

Read the review →
  1. Open Planner StudioConstruction Scheduling Software 9.4Free plan
  2. ALICEConstruction Scheduling Software 8.8Pricing on request

Strengths and trade-offs

  • Open Planner Studio — where it wins

    • Free, open-source package with no subscription or per-seat licence fees
    • CPM, float, deadlines, resources, histograms, levelling, and baselines
    • IFC, CSV, MS Project, and Primavera P6 interoperability

    Where it doesn't

    • No mobile apps; access is through the browser or desktop platforms
    • The only named plan is the free, open-source package
    • The built-in AI assistant is described for reading and editing schedules
  • ALICE — where it wins

    • AI-generated what-if scenarios support schedule optimization
    • Gantt, longest-path, and resource planning in one platform
    • Imports and exports schedules for P6 and Microsoft Project

    Where it doesn't

    • Pricing is contact-sales rather than publicly itemized
    • Web platform only
    • No schedule templates are listed among its category capabilities
  • Open Planner Studio9.4/10 · Free plan

    A capable free scheduler for construction teams needing CPM, resources, and open file exchange.

    Visit Open PlannerFull verdict →
  • ALICE8.8/10 · Pricing on request

    A construction scheduling platform for teams comparing complex project scenarios.

    Visit ALICEFull verdict →

More comparisons

Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026

Last updated · How we research and update