Head-to-head · Construction Scheduling Software
Open Planner Studio vs Asta Powerproject
Open Planner Studio leads on 0 checks, Asta Powerproject on 0, and 4 are even. Who comes out ahead on the 4 yes/no, price and count checks where we have data for both products. The editor score weighs everything else too.
Our verdict
- Highest scoreOpen Planner Studio · 9.4/10
- Free planonly Open Planner Studio
- Most featuresOpen Planner Studio · 3 of 4
Open Planner Studio scores higher on our rubric for construction scheduling software: 9.4 against 8.9 out of 10; our editors rank them #1 and #3.
Open Planner Studio is the better fit for teams needing free construction scheduling software. Asta Powerproject is the better fit for professional construction schedulers.
- Open Planner Studio fits best
Teams needing free construction scheduling software
- Asta Powerproject fits best
Professional construction schedulers
Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.
Side by side
| Feature | Open Planner Studio 9.4/10 Visit ↗ | Asta Powerproject 8.9/10 Visit ↗ |
|---|---|---|
| At a glance | ||
| Editor score | 9.4 | 8.9 |
| Ranking | #1 in Construction Scheduling Software | #3 in Construction Scheduling Software |
| Best for | Teams needing free construction scheduling software | Professional construction schedulers |
| Pricing model | Free | Paid |
| Starting price | Free | £695/user/yr |
| Free plan | ✓ (best) | Not checked yet |
| Free trial | — | — |
| Deployment | Desktop | Cloud, Desktop |
| Platforms | Web, Windows, macOS, Linux | Web, Windows |
| Support | Docs | Email, Phone, Docs |
| Integrations | 4 integrations | 7 integrations |
| Built for | Solo, Small business, Mid-market, Enterprise | Small business, Mid-market, Enterprise |
| Features Open Planner Studio 3/4 · Asta Powerproject 1/4 | ||
| Critical path | ✓ | ✓ |
| Gantt charts | ✓ (best) | Not checked yet |
| Resource planning | ✓ (best) | Not checked yet |
| Schedule templates | Not checked yet | Not checked yet |
| Specs | ||
| Mobile apps | None | Not checked yet |
| Project limit | Not checked yet | Not checked yet |
| Our review | ||
| Pros |
|
|
| Cons |
|
|
| Our verdict | Open Planner Studio is an open-source construction planning application for building, infrastructure, and civil-engineering projects. It is aimed at teams that need structured scheduling rather than a basic task list, with interactive… Read the review → |
Asta Powerproject is construction project management software for planning, scheduling, tracking, and managing work from small construction projects to large programmes. Its Gantt-based planning, task links, critical-path analysis,… Read the review → |
Strengths and trade-offs
Open Planner Studio — where it wins
- Free, open-source package with no subscription or per-seat licence fees
- CPM, float, deadlines, resources, histograms, levelling, and baselines
- IFC, CSV, MS Project, and Primavera P6 interoperability
Where it doesn't
- No mobile apps; access is through the browser or desktop platforms
- The only named plan is the free, open-source package
- The built-in AI assistant is described for reading and editing schedules
Asta Powerproject — where it wins
- Critical-path, baseline, progress, and risk analysis
- Resource allocation with availability and demand-resource checks
- Integrations with Microsoft Project, Primavera, ERP, BIM, and Office
Where it doesn't
- Single-user subscription costs £695 per user per year
- The listed plan installs onto a single Windows PC
- SaaS, concurrent, enterprise, and education options require contact
- Open Planner Studio9.4/10 · Free plan
A capable free scheduler for construction teams needing CPM, resources, and open file exchange.
Visit Open PlannerFull verdict → - Asta Powerproject8.9/10 · Paid
A deep construction scheduler for teams that need critical paths, resources, costs, and risk analysis.
Visit ElecosoftFull verdict →
More comparisons
- Open Planner Studio vs FinitePath
- Open Planner Studio vs ALICE
- Open Planner Studio vs Oracle Primavera Cloud
- Open Planner Studio vs GanttAI
- Open Planner Studio vs Mastt Schedule
- Open Planner Studio vs Autodesk Forma Schedule
- FinitePath vs Asta Powerproject
- Asta Powerproject vs ALICE
All construction scheduling software comparisons → · Full ranking →
Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026
Last updated · How we research and update







