Suggestions appear as you type. Use the up and down arrows to choose one and Enter to open it.

This page's audience our own tag's counts — open to see them
–Visits
–Page views
–Clicks to vendors
–Time on page
–Reading now
Clicks to vendors, by tool
  • –
Top countries
  • –
Devices
  • –

– · visits, page views and clicks counted by our own tag, which counts more than our checked analytics; every figure rounded down · how we count

Head-to-head · Construction Scheduling Software

FinitePath vs ALICE

  • Updated Oct 2026
  • Both researched from official sources
  • 5 checks side by side
Higher score FinitePath #2 in Construction Scheduling Software 9.1/10 Free plan Free plan✓ 4 of 4 features Visit FinitePath
ALICE #4 in Construction Scheduling Software 8.8/10 Pricing on request ✓ 3 of 4 features Visit ALICE

FinitePath leads on 1 check, ALICE on 0, and 4 are even. Who comes out ahead on the 5 yes/no, price and count checks where we have data for both products. The editor score weighs everything else too.

Our verdict

  • Highest scoreFinitePath · 9.1/10
  • Free planonly FinitePath
  • Most featuresFinitePath · 4 of 4

FinitePath scores higher on our rubric for construction scheduling software: 9.1 against 8.8 out of 10; our editors rank them #2 and #4.

FinitePath offers schedule templates; ALICE doesn't.

FinitePath is the better fit for schedulers wanting advanced browser-based planning. ALICE is the better fit for large teams using AI scenario planning.

  • FinitePath fits best

    Schedulers wanting advanced browser-based planning

  • ALICE fits best

    Large teams using AI scenario planning

Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.

Side by side

Feature FinitePath 9.1/10 Visit ↗ ALICE 8.8/10 Visit ↗
At a glance
Editor score 9.1 8.8
Ranking #2 in Construction Scheduling Software #4 in Construction Scheduling Software
Best for Schedulers wanting advanced browser-based planning Large teams using AI scenario planning
Pricing model Free plan + paid Paid
Starting price Free plan Pricing on request
Free plan ✓ (best) Not checked yet
Free trial — —
Deployment Cloud Cloud
Platforms Web Web
Support Email Community, Docs, Tickets
Built for Small business, Mid-market, Enterprise Mid-market, Enterprise
Features FinitePath 4/4 · ALICE 3/4
Critical path ✓ ✓
Gantt charts ✓ ✓
Resource planning ✓ ✓
Schedule templates ✓ (best) —
Specs
Mobile apps Not checked yet Not checked yet
Project limit Not checked yet Not checked yet
Our review
Pros
  • Free plan includes CPM, float analysis, baselines, and delay analysis
  • Imports Primavera P6, Microsoft Project XML, and Excel schedules
  • Combines resource leveling, cost mapping, scenarios, and AI insights
  • AI-generated what-if scenarios support schedule optimization
  • Gantt, longest-path, and resource planning in one platform
  • Imports and exports schedules for P6 and Microsoft Project
Cons
  • Web-only access may not suit teams requiring desktop software
  • Paid subscriptions are referenced without public plan pricing
  • Its advanced controls may exceed the needs of simple scheduling teams
  • Pricing is contact-sales rather than publicly itemized
  • Web platform only
  • No schedule templates are listed among its category capabilities
Our verdict

FinitePath is a web-based construction planning and project-controls platform for schedulers, engineers, superintendents, planners, and other construction professionals. Its shared project model brings together CPM scheduling,…

Read the review →

ALICE is an AI-powered construction scheduling and optioneering platform from ALICE Technologies. It is designed for general contractors, owners, and consultants managing large capital construction projects. Teams can create, import,…

Read the review →
  1. FinitePathConstruction Scheduling Software 9.1Free plan
  2. ALICEConstruction Scheduling Software 8.8Pricing on request

Strengths and trade-offs

  • FinitePath — where it wins

    • Free plan includes CPM, float analysis, baselines, and delay analysis
    • Imports Primavera P6, Microsoft Project XML, and Excel schedules
    • Combines resource leveling, cost mapping, scenarios, and AI insights

    Where it doesn't

    • Web-only access may not suit teams requiring desktop software
    • Paid subscriptions are referenced without public plan pricing
    • Its advanced controls may exceed the needs of simple scheduling teams
  • ALICE — where it wins

    • AI-generated what-if scenarios support schedule optimization
    • Gantt, longest-path, and resource planning in one platform
    • Imports and exports schedules for P6 and Microsoft Project

    Where it doesn't

    • Pricing is contact-sales rather than publicly itemized
    • Web platform only
    • No schedule templates are listed among its category capabilities

More comparisons

Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026

Last updated · How we research and update