Plan an AI data center’s fiber from the fabric outward: choose the accelerator and switch platforms, target link rates, GPU and pod counts, topology, and expansion path before specifying cable. Then convert that design into a port-by-port link schedule and a three-dimensional physical plan for routes, trays, terminations, labeling, service access, and future changes. Fiber is central to scale-out between racks and pods and to longer inter-hall routes, while some scale-up connections inside a rack may use other media. There is no universal fiber count per GPU or universal choice between multimode and single-mode. The correct design depends on optics, reach, channel loss, connectorization, installed plant, and the refresh plan.

What does fiber planning for an AI data center need to accomplish?

A workable plan must connect every server and switch port with the required bandwidth, redundancy, reach, and optical margin while remaining installable and serviceable. AI clusters create unusually dense, repeated connection patterns: links rise with node count, lane breakouts multiply terminations, and a small mapping error can strand a large amount of compute.

Plan at three physical scales:

  • Scale-up: links within a server or rack, often determined by the accelerator and server platform. Some of these connections may use copper or another media rather than fiber.
  • Scale-out: server-to-leaf and leaf-to-spine connections between racks and pods. This is where high-count fiber trunks, breakouts, and structured cabling commonly become important.
  • Scale-across: links between halls, buildings, or other separated facilities, where route length and optical budget usually dominate the design.

The output should be more than a cable count. It should include a logical topology, a port and lane map, a route survey, an optical-channel specification, a labeling scheme, spare capacity, and acceptance tests.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How do you start an AI-fabric fiber plan?

Begin with the compute and network decisions that determine the connections. A cable design made before those decisions will usually be rebuilt.

#1 Best Overall
Elebase USB to USB C Adapter for iPhone 18 Pro Max,USBC Car Charger Adapter | 4Pack Type C Female to A Male Cable Converter for Apple Duo 17 16 15 14 Plus,iWatch Watch 12 11 10,iPad 9 8 Air,Airpods 5 4
  • Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
  • Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
  • Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
  • Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
  • 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.

Record the compute and fabric inputs

Create a controlled design record containing:

  • Accelerator model and total accelerator count.
  • Number of nodes and planned nodes per rack.
  • Switch system, Ethernet or InfiniBand choice, and switch-port capacity.
  • Target port rate, including whether the design uses 200G, 400G, or 800G optics.
  • Whether the fabric has separate scale-up and scale-out networks.
  • Pod size, rack arrangement, redundant-path requirements, and the next planned expansion.

Corning’s H100 cabling guidance identifies pod size, GPU count, topology, fabric choice, and 200G/400G/800G optics as planning inputs. Treat those as inputs to your own platform-specific design, not as a universal sizing formula.

Draw the logical topology before choosing cable

Show every server-facing port, leaf switch, spine switch, and any core tier. Record lane breakouts explicitly: one high-speed port may fan out to several lower-rate links, each with its own fibers, connectors, polarity, and destination. Draw the redundant path separately so that a single route, tray, or patching error cannot remove both paths.

Build a port-level link schedule

For each connection, assign a source port, destination port, optic type, fiber mode, connector and polarity, route, length, and spare allocation. The schedule should be the authoritative list used by procurement, installation, labeling, testing, and operations. A generic “number of GPUs multiplied by a cable factor” cannot account for topology, breakout, switch capacity, or route geometry.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How much fiber does an AI data center need?

There is no reliable universal answer because fiber demand follows ports, lanes, topology, and redundancy rather than GPU count alone. Count links from the logical drawing, then map those links onto actual routes and assemblies.

Use connection classes instead of a single multiplier

Connection class What to count Design questions
Server to leaf Server ports, lane breakouts, and redundant paths for each node Which optic and breakout format does the server platform require?
Leaf to spine Every uplink, its lanes, and the number of parallel paths Will links be direct, patched through a cross-connect, or connected through a distribution system?
Spine to core Core-facing uplinks and any inter-pod or inter-hall links What reach, route diversity, and optical budget are required?
Expansion reserve Unused ports, fibers, tray space, and cabinet positions Where will the next pod or row connect without disturbing live services?

A deployment example reported by Data Center Dynamics illustrates the scale: Corning’s Michael Crook said that a rack with up to 72 GPUs spread across multiple server trays can consume more than 1,100 fibers for in-rack compute cabling. That is an attributed example, not a specification for every 72-GPU rack; server architecture, media choice, and topology can change the result substantially.

Separate fiber count from strand count

State whether a number refers to individual fibers, duplex links, cable assemblies, or trunk positions. A high-density MPO trunk may carry many fibers in one jacket, while a breakout assembly presents those fibers as multiple duplex or parallel connections. Procurement and installation teams need both the logical link count and the physical strand and connector count.

How should topology determine the cable schedule?

Topology determines where fiber terminates and how much patching, breakout, and route diversity the installation needs. Corning’s cabling guidance covers the three common tiers: server-to-leaf, leaf-to-spine, and spine-to-core.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Server-to-leaf links

Start at each node and follow every network interface to its assigned leaf port. Capture lane mapping when a port is split. Keep redundant interfaces on physically diverse paths where the availability design requires it, rather than placing both in one trunk or tray.

Rank #2
Sale
Anker USB-C Hub, 5-in-1 USB Hub for Laptops, 4K HDMI Multiport Adapter | USB C Dongle with 90W Max Power Delivery, 3×5Gbps USB A Data Ports, for MacBook, Dell, and More (Charger Not Included)
  • 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
  • 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
  • Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
  • 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
  • What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.

Leaf-to-spine links

Count the uplinks required by the fabric design and assign them across spine switches. A leaf-spine diagram should identify which fibers belong to which port-channel or equivalent logical bundle. Keep polarity and lane order consistent across repeated assemblies so technicians can install and replace them without translating a different scheme for every rack.

Spine-to-core and inter-pod links

These routes often travel farther and cross more pathway sections. Record the maximum route length, every cross-connect, and the resulting channel-loss budget before selecting optics. If halls or buildings are separated, include route diversity, entry points, and protection from construction or maintenance work.

Use a schedule that installation teams can audit

At minimum, give each link a unique identifier and include:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • Source and destination rack, cabinet, switch, port, and lane.
  • Assembly type, fiber mode, strand count, connector gender and polish, and polarity.
  • Planned route, length, service-loop locations, and tray or ladder section.
  • Optic part family and the applicable reach and loss limits.
  • Test record reference and final as-built status.

Should an AI cluster use structured cabling?

Structured trunks and patching can make thousands of repeated connections easier to organize, but they are an architecture choice rather than an automatic upgrade. Point-to-point runs may be simpler for a small, stable layout; structured systems can improve administration and change control when racks, pods, and link rates evolve.

Factor Point-to-point cabling Structured trunks and patching
Connection path Direct run between the endpoints Trunks, distribution hardware, and patch connections between endpoints
Change flexibility Moving a rack or changing topology can require replacing long runs Cross-connects can make endpoint changes more manageable when the port map is designed correctly
Insertion-loss budget Fewer connection points can simplify the loss calculation Every trunk, adapter, and patch point must be included in the channel budget
Installation and labeling Many individual runs can be difficult to route and identify at high density Factory-terminated assemblies and repeatable panels can organize dense, repeated links
Fault isolation Fewer intermediate points, but a failed run may require tracing the full route Cross-connects can provide accessible test and service points if they are clearly documented
Procurement complexity More individual lengths and endpoint combinations More up-front design of trunk length, breakout, connectorization, and panel compatibility

Corning’s Nate Hefner described structured cabling as a way to address the mess and time involved in connecting 10,000 GPUs with individual patch cords, particularly as deployments move from 400G toward 800G. Corning also claims its cable assemblies can install up to four times faster than traditional approaches; that is a vendor claim, not an independent field measurement.

Choose structured cabling when the repeated topology, density, and change pattern justify the additional design work. Do not assume a trunk is compatible merely because it has the right fiber count: polarity, gender, polish, breakout order, and optic interface must match the link schedule.

How do you choose multimode or single-mode fiber?

Select fiber mode per channel after confirming the optic, reach, channel-loss limit, connector plan, installed plant, and expected upgrade path. Neither mode is a universal answer for an AI data center.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Decision factor Multimode Single-mode
Typical role in this design process Can suit selected short-reach Ethernet and server-attachment applications when the transceiver supports it Can suit longer reaches or architectures whose optics and migration plan call for it
Primary check Confirm the chosen multimode optic, distance, channel loss, and connector performance Confirm the chosen single-mode optic, distance, channel loss, and connector performance
Installed-plant consideration Reuse is practical only when the existing plant meets the new optic and loss requirements Reuse is practical only when the existing plant, connectors, and route budget meet the selected optic requirements
Upgrade consideration Check whether the next link rate and transceiver generation continue to support the installed fiber Check optic availability, cost, and migration requirements for the next generation

IEEE’s overview of IEEE 802.3db describes 100 Gb/s signaling over multimode fiber for server attachment and machine-learning clusters. IEEE’s 802.3ck overview addresses 100 Gb/s per electrical lane and provides standards context for later 800 Gb/s and 1.6 Tb/s Ethernet systems. Those standards do not replace the selected transceiver datasheet or a channel calculation.

Rank #3
Sale
Anker USB C Hub, 7in1 Multi-Port USB Adapter, 4K@60Hz USBC to HDMI Splitter | 85W Max PD, 2 USB 3.0 & 1 USBC Data Ports, SD/TF Card Reader, for Laptops/Mac and Other Type C Devices (Charger Not Included)
  • Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
  • Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
  • Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
  • Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
  • What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.

For every link class, document the optic’s supported fiber type, maximum reach, connector requirements, and loss allowance. If a refresh may change the mode or connector arrangement, reserve a migration path rather than labeling the installed plant simply “future-proof.”

How do you plan fiber for 800G and later rates?

Start with the electrical-lane and optical architecture of the target platform, then verify the complete channel. An “800G-ready” label has meaning only when the actual fiber, connectors, transceivers, lane mapping, and route length satisfy the future specification.

Track lane and wavelength choices

Higher rates can be achieved through more wavelengths, more fibers, or a combination. A 2024 IEEE Hot Interconnects conference abstract frames the engineering question as whether it is better to scale with more wavelengths or by adding more fibers; it does not provide one answer for every deployment. Your design should record which approach the chosen optics use and how a later generation changes strand, connector, and port requirements.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Validate the whole channel, not just the trunk

Include the transceiver, trunk, patch cords, adapters, splice points if any, and every polarity or lane breakout. A trunk with a suitable strand count can still fail the channel if connector loss, route length, or polarity is wrong. Ask vendors for the applicable channel specification and compare it with the project’s measured route and acceptance criteria.

Reserve physical capacity

Leave tray fill, cabinet positions, panel space, and pathway access for the next pod or link-rate migration. Keep spare fibers and ports where they can be reached without removing live assemblies. The reserve should be shown on the drawing and in the port schedule, not left as an informal installation assumption.

How do you turn a logical design into real cable routes?

A two-dimensional rack diagram cannot show ceiling height, tray turns, congestion, service loops, or access for future work. Perform a route survey or three-dimensional model before ordering final lengths.

Survey the pathway

  • Confirm rack coordinates, row orientation, overhead tray and ladder elevations, and entry points.
  • Measure the actual route, including vertical drops, turns, separation between redundant paths, and service loops.
  • Check fill, bend protection, support spacing, and the ability to pull or replace high-count assemblies.
  • Identify obstructions, fire-rated penetrations, doors, maintenance zones, and areas likely to change.

Protect bend radius and access

Use the cable manufacturer’s bend-radius requirements at trays, panels, and vertical transitions. Put service loops where technicians can reach them without blocking airflow or equipment doors. Do not bury a cross-connect behind a fixed rack or route both redundant paths through one inaccessible bottleneck.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Plan density at the rack and panel

High-count trunks reduce the number of jackets but concentrate weight, bend management, and termination density. Provide cabinet hardware that supports the connector type and leaves enough working clearance for inspection and cleaning. If the topology uses fiber shuffling or lane breakouts, show those devices and their port order on the rack elevation.

Rank #4
Sale
UGREEN USB to USB C Adapter Combo 4-Pack, 10Gbps USB C Converter Space Gray | Data transfer & Fast charging for MacBook, iPhone 17/16/15, iPad, Samsung Galaxy, Apple Watch
  • Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
  • Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
  • Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
  • Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
  • Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft

Label both ends and every administration point

Use durable, machine-readable identifiers at both endpoints and at cross-connects. The label should resolve directly to the port schedule, route, optic, and test record. A color scheme can help technicians, but it should supplement—not replace—the unique identifier.

Can multicore or high-density fiber reduce environmental impact?

Potentially, but the result depends on the architecture and the boundaries of the calculation. Corning’s 2026 model compared passive optical components for a representative 18,432-GPU data hall:

Modeled configuration Passive-component carbon impact Scope and qualification
Single-core fiber case 4,549 metric tons CO₂e Corning model for the representative 18,432-GPU hall
Four-core multicore-fiber case 1,792 metric tons CO₂e Same modeled scope and compute footprint
Reported comparison Up to 60% lower per GPU in the multicore case Vendor-authored scenario; transceivers and broader facility pathway changes were excluded

The model indicates that reducing passive material and pathway demand can matter in a particular architecture. It does not guarantee a project saving, establish a universal multicore design, or account for every operational and facility impact. When comparing options, state the boundary: passive components, transceivers, pathways, energy, transport, and end-of-life may produce different conclusions.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What should commissioning and acceptance testing verify?

Commissioning should prove that the installed channel matches the engineered schedule and the selected optic’s requirements. Because loss limits vary by component and project, use the applicable specifications rather than a universal threshold.

  1. Inspect and clean connectors. Verify endfaces and adapters before mating, following the component manufacturer’s procedure.
  2. Check polarity and lane order. Confirm that every breakout and trunk maps the intended transmit and receive lanes.
  3. Verify continuity. Test each scheduled strand from source to destination and identify unused or spare fibers.
  4. Measure channel loss. Test the complete installed channel against the optic and project loss budget, including patch points and breakouts.
  5. Reconcile the map. Compare test results with rack elevations, labels, port schedules, and switch configuration.
  6. Capture as-built records. Store route drawings, cable identifiers, optic information, test files, deviations, and approved changes in the operations system.

Do not accept a cable merely because light passes through it. A reversed polarity, incorrect lane order, contaminated connector, or excessive loss can remain hidden until the fabric is loaded or a redundant path is needed.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What should you specify when procuring MPO trunk cables and related hardware?

“MPO fiber optic trunk cable” is a useful category for high-density data-center connections, but it is not a one-size-fits-all purchase. Send suppliers the engineered link schedule and require a written match to every field.

  • Fiber mode and performance class.
  • Total strand count and whether the assembly is a trunk, harness, or breakout.
  • Connector type, gender, polish, keying, and polarity.
  • Length based on the surveyed route, including planned service loops.
  • Optic interface, lane mapping, and supported rate.
  • Panel, cassette, adapter, and distribution-hardware compatibility.
  • Test documentation, labeling format, and identification of each end.
  • Spare assemblies, spare fibers, and the expansion quantity shown in the capacity plan.

Preterminated assemblies can shorten repetitive installation and improve consistency, but factory termination does not remove the need to verify reach, optical budget, connector compatibility, and route length.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What are the most common planning failures?

Ordering before the topology is fixed

Symptom: cables arrive with the wrong breakout or insufficient ports. Fix: freeze the port-level link schedule and obtain approval for accelerator, switch, optic, and topology assumptions before releasing cable quantities.

Best Value
Anker USB C Hub, 5-in-1 USBC to HDMI Splitter with 4K Display | 85W Max PD, 1 Powered USB-C 5Gbps & 2 Powered USB-A 3.0 5Gbps Data Ports, for MacBook Pro, MacBook Air, Dell and More (Black)
  • 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
  • Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
  • Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
  • HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
  • What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.

Using a GPU-per-rack multiplier

Symptom: the count looks plausible but misses lane breakouts, redundant paths, or spine links. Fix: count every logical connection and then translate it into strands, assemblies, and routes.

Ignoring three-dimensional geometry

Symptom: ordered lengths are short, trays are overfilled, or service loops block access. Fix: survey actual elevations, turns, congestion, and rack placement before final length approval.

Treating “800G-ready” as a certification

Symptom: a future optic fails the installed channel. Fix: validate the specific fiber, connector, transceiver, lane map, route, and loss specification for the intended upgrade.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Leaving administration until the end

Symptom: technicians cannot identify a fiber or isolate a failed path. Fix: assign identifiers, labels, port maps, and test-record references as part of design, then audit them during commissioning.

Assuming structured cabling solves every density problem

Symptom: patch panels add loss or become a new congestion point. Fix: compare the number of cross-connects, insertion-loss budget, service access, and expected changes before selecting trunks and panels.

How should the plan be maintained as the cluster grows?

Make the fiber design a living infrastructure record. Every new pod, switch replacement, or optic-rate change should update the topology, route drawing, port schedule, spare inventory, and test results together.

  • Reserve named expansion zones rather than relying on unmarked empty tray space.
  • Keep spare fibers and ports physically accessible and identify them in the schedule.
  • Require change control for polarity, lane mapping, connector, or route changes.
  • Retest any channel that is reterminated, repatched, or moved.
  • Review pathway capacity before each expansion wave, not after racks arrive.
  • Bring cabling engineers into platform planning early; Corning representative Michael Crook specifically advises engineering teams to collaborate before hardware and cabling decisions are locked.

The result is a design that can add compute without turning every expansion into a custom outage project.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Frequently Asked Questions

What is fiber shuffling in an AI data-center network?

Fiber shuffling is the deliberate rearrangement or breakout of fiber lanes so a high-density trunk can connect to ports in the order required by the topology. It is useful when physical port order and logical lane order differ, but the shuffle must be documented and tested because an incorrect map can create apparently healthy yet miswired links.

How early should a cabling engineer join an AI data-center project?

Before the accelerator, switch, optic, and rack layout are frozen. Early review lets the team check pathway geometry, connector compatibility, route diversity, and expansion capacity while changes are still inexpensive.

What information should be handed to an installer on day one?

Provide the approved rack elevations, port-and-lane schedule, route drawings, assembly specifications, labeling rules, polarity standard, and acceptance-test procedure. Include a controlled revision identifier so installers do not work from an obsolete topology.

Can an existing data-center fiber plant be reused for an AI cluster?

It can be reused only after the installed fiber, connectors, route lengths, and measured channel loss are checked against the new transceivers and link rates. Existing labels and drawings should be treated as design inputs to verify, not as proof that every channel is usable.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.