A U.S. nuclear aircraft carrier’s midlife Refueling and Complex Overhaul (RCOH) is planned to take about four years, but the actual schedule can be longer. USS George Washington’s maintenance period lasted 2,117 days—nearly six years. An RCOH combines reactor refueling with extensive ship repairs, modernization, and testing; it is not just a refueling stop.

What does RCOH mean, and when does it happen?

RCOH stands for Refueling and Complex Overhaul. The U.S. Navy describes it as a carrier’s midlife overhaul, normally around the 25-year point, intended to prepare the ship for the second half of its planned service life. The precise work package depends on the individual ship and its condition.

For USS John C. Stennis, the Navy said in 2021 that the planned RCOH would take approximately 48 months and account for about 35 percent of the carrier’s lifetime depot-level maintenance. In a 2026 announcement about USS Harry S. Truman, the Navy described RCOH as nearly one-third of the maintenance and modernization the carrier will receive during a service life exceeding 50 years. Those figures describe the respective Navy programs, not a universal formula for every carrier. U.S. Navy, May 13, 2021; U.S. Navy, September 30, 2026.

How long does a U.S. aircraft carrier overhaul take?

Use about four years as the planning baseline for an RCOH, not a guaranteed finish date. A completed example shows how much the actual elapsed time can differ: USNI News reported that George Washington’s maintenance period lasted 2,117 days. Dates are meaningful only when the milestone is clear; shipyard arrival, undocking, sea trials, and final redelivery are not interchangeable.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Metal Earth Premium Series USS Midway Aircraft Carrier 3D Metal Model Kit Fascinations
  • HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up.
  • NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs.
  • PREMIUM SERIES USS MIDWAY AIRCRAFT CARRIER - 2 Sheet Model with a challenging difficulty level. Once assembled, dimensions are 8.27 L x 2.24 W x 1.38 H inches. 1:1410 Scale.
  • FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
  • HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
Case Duration or schedule What the figure means
Stennis RCOH plan Approximately 48 months Navy’s 2021 planned maintenance period; not an actual completion duration. U.S. Navy, May 13, 2021.
George Washington maintenance period 2,117 days Completed elapsed maintenance period reported by USNI News in 2023; nearly six years. USNI News, August 2, 2023.
Truman RCOH Scheduled for completion in November 2031 Future target announced in September 2026, after the carrier arrived at Newport News on September 30, 2026; it is not a completed outcome. U.S. Navy, September 30, 2026; HII, September 30, 2026.

What happens during an aircraft carrier RCOH?

The overhaul combines nuclear-power-plant work with broad depot-level maintenance and modernization. The Navy’s Stennis account describes structural and machinery work as well as propulsion-plant repairs and operating tests. HII’s account of Truman’s work lists hull and freeboard blasting and painting; repairs to propellers, sea chests, shafts, and rudders; and defueling and refueling of the power plant. The exact tasks vary with ship condition and the approved work package.

1. Prepare, inspect, and gather materials

Planning and material procurement begin well before the main shipyard effort. For Truman, HII reported years of advance planning, long-lead material orders, thousands of inspections, and preliminary work. The Navy’s Stennis account describes an early preparation period called “Smart Start,” involving temporary services, removal of decking and catapult equipment, painting and sampling, and refueling preparations.

Rank #2
Academy USS Enterprise CVN-65 Aircraft Carrier Plastic Model Kits 1/600 Scale
  • Needs Assembly; Glue is Needed;(Not Included) If you want the same body color of the sample images, paint is needed(Not Included)
  • Includes photo etched radar, ladder, railing, masking seal, tractor, car, aircraft and display stand
  • Includes photo etched radar, ladder, railing, masking seal, tractor, car, aircraft and display stand;"
  • Includes photo etched radar, ladder, railing, masking seal, tractor, car, aircraft and display stand;"

2. Offload equipment and supplies

During the Shipboard Consolidated Offload and Outfitting Plan, the crew and contractors removed equipment and supplies that were not built into the ship and placed them in storage. Clearing these items supports access and work inside the carrier.

3. Refuel, repair, and modernize

The nuclear plant is defueled and refueled as part of the larger overhaul. Work also includes propulsion repairs, hull and underwater-component maintenance, and repairs, replacements, or upgrades to ship systems. The Navy characterizes Truman’s RCOH as a full recapitalization involving modernization, upgrades, and ship-system repairs—not reactor work alone. U.S. Navy, September 30, 2026.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
SEMKY Military Series USS Enterprise Aircraft Carriers MOC Building Blocks and Engineering Toy(1883 Pieces)
  • Features: This SEMKY USS Enterprise Aircraft Carriers model has sliding wheels that link the propeller to turn. It truly reflects the sophistication of Military Warship with its clean, modern lines and sculpted surfaces.
  • Giftable:An immersive and rewarding building experience with this highly authentic SEMKY USS Enterprise Aircraft Carriers, packed with realistic features and functions.
  • Function: Wonderful recreation activity, a perfect gift for both adults and ages 10 years up children. Putting this set together with your partner, parent, child or friend and have a keepsake to remember the moment.
  • Exhibitability: The SEMKY USS Enterprise Aircraft Carriers models with incredible detail, astounding authenticity and unparalleled realism. After finish, Collect, Build and Display World Famous Craft in your home, Wonderful 3D art.
  • Note: All pieces in SEMKY products are sorted and packaged by the machine. We can only confirm the packaging after many strict inspections.. If your sets are still missing pieces, please contact us. We will send the missing parts to you for free, thanks in advance.

4. Test the ship before returning it to sea

After major work, the Navy lists a progression that includes shore steaming, cold and hot operations, power-range testing, a total-ship test program, “fast cruise,” and sea trials. These milestones check the plant and ship systems before the carrier resumes operations at sea. U.S. Navy, May 13, 2021.

Why can an overhaul take longer than planned?

The schedule depends on more than the original work plan. Inspections can reveal mandatory work that was not apparent beforehand, and the ability to complete planned tasks depends on funding, parts, and shipyard capacity.

Rank #4
Tamiya 31712 1/700 US Aircraft Carrier Yorktown Plastic Model Kit
  • Hanger doors may be depicted in open or closed position
  • Elevator at the stern may be depicted in up or down position
  • 1/700 Scale Warship
  • Ship condition and growth work: Findings during inspections can add repairs beyond the work initially estimated. Navy reporting on Stennis cited mandatory growth work identified through ship-condition assessments.
  • Planning and funding changes: USNI News reported that changes and delays in George Washington’s planning and induction after earlier budget decisions contributed to its extended period.
  • Parts and competing fleet needs: USNI News reported that critical parts were removed to support higher-priority deploying carriers, affecting George Washington’s schedule.
  • Industrial capacity and workforce disruptions: The accounts of George Washington and Stennis cited industrial-base challenges; USNI News also reported COVID-19 effects on the workforce and industrial base.

These factors explain why a planned duration and a completed duration can differ; they do not establish that every carrier will encounter the same delays. USNI News, August 2, 2023; U.S. Navy, May 13, 2021.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What is the current schedule for USS Harry S. Truman?

On September 29, 2026, the Navy announced a $5.1 billion fixed-ceiling incentive contract with Newport News Shipbuilding for Truman’s RCOH. Truman arrived at the shipyard on September 30, and the Navy’s announced target is completion in November 2031. That is a planned date, not evidence of the eventual duration. The contract value and schedule are specific to Truman and should not be treated as standard figures for other carrier overhauls. U.S. Navy, September 30, 2026; HII, September 30, 2026.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Quick Recap

Bestseller No. 4
Tamiya 31712 1/700 US Aircraft Carrier Yorktown Plastic Model Kit
Tamiya 31712 1/700 US Aircraft Carrier Yorktown Plastic Model Kit
Hanger doors may be depicted in open or closed position; Elevator at the stern may be depicted in up or down position
$29.83
SaleBestseller No. 5
Tamiya 78007 1/350 USS Enterprise Aircraft Carrier Plastic Model Boat Kit
Tamiya 78007 1/350 USS Enterprise Aircraft Carrier Plastic Model Boat Kit
Highly accurate static display model.; Kit is 38.47 Inch long; Deck-Edge Elevator can be in either up or down position
$173.44
Best Value
Sale
Tamiya 78007 1/350 USS Enterprise Aircraft Carrier Plastic Model Boat Kit
  • Highly accurate static display model.
  • Kit is 38.47 Inch long
  • Deck-Edge Elevator can be in either up or down position
  • 1/350 Scale Warship

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.