AI is beginning to change preconstruction by making large sets of design, cost, schedule and document data easier to analyse, but it has not yet become standard practice. In the Royal Institution of Chartered Surveyors (RICS) Artificial intelligence in construction report 2025, about 45% of respondents said their organisation had no AI implementation, while only a small minority reported regular or organisation-wide use. Practitioners see the greatest near-term potential in comparing design options, followed by scheduling, progress monitoring, estimating, document review and resource planning.

That distinction matters: the RICS figures describe reported adoption and expectations, not proven reductions in cost, programme duration or defects. A responsible preconstruction strategy treats AI as decision support. Professionals still set requirements, validate assumptions, approve designs and remain accountable for safety, cost and compliance.

What does AI do in the preconstruction phase?

AI in preconstruction means using machine-learning, generative-AI or rules-based automation to interpret project information before physical work starts. It can search drawings and specifications, compare design alternatives, extract quantities, identify schedule conflicts, classify risks and produce draft analyses for professional review.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Preconstruction is broader than design alone. It can include feasibility, concept and detailed design, estimating, procurement planning, programming, permitting, constructability review and risk preparation. Some functions, such as progress monitoring, continue after mobilisation, so sector surveys should not be read as measuring preconstruction-only adoption.

#1 Best Overall
Elebase USB to USB C Adapter for iPhone 18 Pro Max,USBC Car Charger Adapter | 4Pack Type C Female to A Male Cable Converter for Apple Duo 17 16 15 14 Plus,iWatch Watch 12 11 10,iPad 9 8 Air,Airpods 5 4
  • Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
  • Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
  • Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
  • Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
  • 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.

What AI changes first

  • Speed of analysis: software can screen many documents or design scenarios faster than a person working manually.
  • Consistency: a configured workflow can apply the same checks to every revision, provided the underlying data is reliable.
  • Traceability: a governed system can retain prompts, source documents, assumptions and approvals for later review.
  • Decision breadth: teams can evaluate more options instead of selecting the first workable scheme.

These are workflow capabilities, not guarantees. An AI output is only as dependable as its source data, configuration and human review.

How widely is AI being adopted in construction?

Adoption is still at an experimental stage for most organisations. RICS reported six questions from its Q1 2025 Global Construction Monitor, which received more than 2,200 responses worldwide. The figures below describe respondents’ reported organisational status, not an audit of every construction company.

Reported status Share of respondents What it indicates
No AI implementation Approximately 45% AI had not been implemented in the respondent’s organisation.
Early pilot phase 34% Experiments or limited trials were under way.
Regular use in specific processes Just under 12% AI was used repeatedly for selected workflows.
Use across multiple processes 1.5% Deployment extended beyond one isolated process.
Fully embedded organisation-wide use Less than 1% AI was integrated broadly across the organisation.

The main survey’s responses came from several regions: 48% from the UK, 19% from Asia Pacific, 14% from the Middle East and Africa, 10% from the Americas and 8% from Europe. Because the UK was the largest single regional group, the results should be treated as a global sentiment snapshot with an uneven regional mix, not a census.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Why is design optioneering the leading expected impact?

Design optioneering is the structured comparison of alternative solutions against constraints such as area, cost, carbon, programme, buildability and client requirements. Forty percent of RICS respondents selected it as the area where AI would have the greatest impact over the next five years, the highest share for any listed function.

An AI-assisted option study might generate or classify alternatives, test them against a parameter set, highlight conflicts and prepare a comparison for the design team. For example, a team could ask a system to organise façade options by embodied-carbon assumptions, floor-area targets and procurement constraints, then have engineers verify the calculations and code compliance.

Rank #2
Sale
Anker USB-C Hub, 5-in-1 USB Hub for Laptops, 4K HDMI Multiport Adapter | USB C Dongle with 90W Max Power Delivery, 3×5Gbps USB A Data Ports, for MacBook, Dell, and More (Charger Not Included)
  • 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
  • 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
  • Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
  • 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
  • What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.

The 40% figure is an expectation, not evidence that AI-generated designs are inherently better. A visually attractive option can fail planning rules, structural checks, fire requirements, lifecycle targets or budget limits. Human designers and statutory specialists must approve the criteria and the final choice.

What makes an option study credible?

  • A written brief defining performance requirements and non-negotiable constraints.
  • Version-controlled drawings, models, specifications and cost assumptions.
  • Explicit units, locations, building codes and escalation dates.
  • A record of which alternatives were rejected and why.
  • Independent checking of calculations and compliance before a decision is issued.

Which other preconstruction workflows can AI support?

RICS respondents identified several project functions as having high positive significance. These results show where practitioners see opportunity; they do not demonstrate realised savings or accuracy improvements.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Function Respondents selecting high positive significance Typical preconstruction use
Project scheduling 36% Drafting activity logic, identifying sequencing conflicts and testing programme scenarios.
Progress monitoring 36% Comparing reported or captured progress with planned work; this often spans construction as well as planning.
Resource optimisation 30% Exploring labour, plant, material and site-logistics allocations.
Contract and document review 30% Finding clauses, obligations, exclusions, missing information and inconsistent terminology.
Risk management 29% Classifying risk registers, surfacing dependencies and drafting mitigation prompts.

Estimating and quantity take-off

AI can extract quantities from structured models or drawings, map items to a cost database and flag unusual movements between estimates. It can also draft assumptions and identify missing scope. Estimators must check measurement rules, specification interpretation, location factors, market conditions, supplier quotations, escalation and exclusions. A generated quantity is not a tender-ready measurement until a qualified person validates it.

Scheduling and constructability

Systems can analyse activity relationships, compare a proposed sequence with historic patterns and highlight clashes between trades or access requirements. The useful output is a scenario for the planner to test, not an automatically approved baseline. Site constraints, permits, long-lead items, weather allowances, labour agreements and temporary works still require project-specific judgment.

Document and contract review

Language models can locate clauses across large document sets and produce a first-pass list of obligations, notice periods or inconsistencies. They can miss context, misread defined terms or invent a citation. Keep the source paragraph with every extracted point, restrict access to confidential material and require commercial or legal review before anyone relies on the result.

Rank #3
Sale
Anker USB C Hub, 7in1 Multi-Port USB Adapter, 4K@60Hz USBC to HDMI Splitter | 85W Max PD, 2 USB 3.0 & 1 USBC Data Ports, SD/TF Card Reader, for Laptops/Mac and Other Type C Devices (Charger Not Included)
  • Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
  • Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
  • Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
  • Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
  • What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.

Resources, sustainability and safety planning

RICS recommends near-term use cases that include resource planning, cost estimating, sustainability and safety. AI may help compare material scenarios, identify resource bottlenecks or organise hazard information. Those outputs are prompts for competent professionals; they are not a substitute for statutory design duties, risk assessments, method statements or site supervision.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is holding organisations back?

The principal obstacles are practical rather than a lack of interesting demonstrations. RICS respondents identified the following implementation barriers:

Barrier Share citing it Why it matters in preconstruction
Lack of skilled personnel 46% Teams may not know how to select, configure, validate or govern AI workflows.
Integration with existing systems 37% Drawings, models, cost plans and schedules may use incompatible formats or permissions.
Data quality and availability 30% Missing, inconsistent or outdated project data produces unreliable analysis.
High implementation cost 29% Configuration, integration, security and training can exceed the software licence.
Unclear return on investment 28% Time saved in one task may not offset review, correction and governance effort.
Lack of standards or guidance 25% People may not know what data, audit trail or approval standard is acceptable.

These percentages are survey responses, so they can overlap: one organisation may face several barriers at once. Poorly structured information is especially consequential because an AI system can process bad data quickly and make the result look authoritative.

How should a construction firm start an AI preconstruction pilot?

Start with one bounded, repeatable task and a measurable baseline. RICS’s recommendations emphasise upskilling, cross-functional leadership, prioritised use cases, better project-data governance, due diligence, ethical safeguards and human oversight.

  1. Choose a narrow workflow. Select a task such as searching specifications, checking estimate revisions or comparing schedule scenarios. Avoid an initial goal such as “automate design,” which has no clear boundary.
  2. Define the baseline. Record current cycle time, rework, error findings, review hours and user satisfaction for several comparable tasks. Without a baseline, a faster draft may simply move effort into correction.
  3. Inventory the data. Identify authoritative drawings, models, specifications, cost codes, schedules and risk registers. Record owners, revision status, formats, retention rules and access permissions.
  4. Set acceptance tests. Prepare representative examples containing known quantities, clauses, clashes or risks. Specify the minimum recall, precision, completeness and response time required for a useful result.
  5. Assign accountability. Name the professional who approves each output and define decisions the system is never allowed to make autonomously, particularly those affecting safety, compliance, cost commitments or contractual rights.
  6. Run a controlled pilot. Use a segregated environment, approved data and a limited user group. Log prompts, source files, model or system version, outputs, corrections and approvals.
  7. Measure the whole workflow. Include preparation, checking, correction, training, integration and governance time, not just the time taken to generate an answer.
  8. Decide whether to scale. Expand only when results beat the baseline without unacceptable quality, confidentiality or accountability risks. Document lessons and update the acceptable-use policy.

How can teams evaluate whether an AI pilot is worthwhile?

Use a balanced scorecard rather than a single “accuracy” percentage. Compare AI-assisted work with the existing process on the same type of project and under the same information constraints.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #4
Sale
UGREEN USB to USB C Adapter Combo 4-Pack, 10Gbps USB C Converter Space Gray | Data transfer & Fast charging for MacBook, iPhone 17/16/15, iPad, Samsung Galaxy, Apple Watch
  • Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
  • Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
  • Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
  • Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
  • Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
Dimension Questions to measure
Workflow Did cycle time or manual search effort fall, and where did review work increase?
Evidence quality Were outputs checked against authoritative documents, and how often were errors or omissions found?
Integration Can users access current data without duplicate entry or uncontrolled exports?
Professional accountability Is every decision linked to a named reviewer and an approval record?
Governance Are permissions, retention, audit logs, transparency and incident handling working?
Business case Do quantified benefits exceed implementation, review, training and support costs?

RICS recommends using performance metrics, benchmarks and user feedback as adoption expands. A pilot that improves speed but increases unresolved errors, security exposure or coordination failures is not a successful transformation.

What governance does responsible AI require?

Before connecting project information to an AI service, establish an acceptable-use policy. It should state which data may be uploaded, which systems are approved, how confidential or personal information is handled, how outputs are labelled and when human review is mandatory.

Minimum controls

  • Data governance: maintain a common data environment, clear naming and revision rules, and agreed open formats where practical.
  • Access control: give users only the project and document permissions they need; review supplier access and deletion terms.
  • Explainability: retain the source passages, model assumptions and transformation steps behind material recommendations.
  • Fairness and transparency: test whether historical data or automated rankings disadvantage a group, supplier or design option without a defensible reason.
  • Auditability: log versions, prompts, outputs, corrections and approvals so a decision can be reconstructed.
  • Escalation: define how users report hallucinated content, data leaks, unsafe recommendations or suspected bias.

RICS identifies explainability, fairness, transparency, formal oversight, audit mechanisms, accountability and performance evaluation as medium-term priorities. Governance is therefore part of the system design, not paperwork added after deployment.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What can AI not replace in early building decisions?

AI cannot assume the legal duty of a designer, cost consultant, planner, contractor or client representative. It does not automatically know whether a source is current, whether a local authority will accept an interpretation, or whether a proposed sequence is safe on a particular site.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • Licensed or otherwise qualified professionals must validate design, structural, fire, accessibility and environmental decisions.
  • Estimators must confirm measurement rules, market evidence, exclusions and commercial assumptions.
  • Planners must test logic against real resources, access, permits, procurement and site constraints.
  • Contract specialists must interpret obligations and obtain formal advice where rights or liabilities are affected.
  • Clients must decide which trade-offs among cost, time, quality, carbon and risk are acceptable.

The safest division of labour is to let AI find patterns, draft alternatives and expose questions while people set the brief, challenge the result and make the decision.

Best Value
Sale
Anker USB C Hub, 5-in-1 USBC to HDMI Splitter with 4K Display | 85W Max PD, 1 Powered USB-C 5Gbps & 2 Powered USB-A 3.0 5Gbps Data Ports, for MacBook Pro, MacBook Air, Dell and More (Black)
  • 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
  • Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
  • Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
  • HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
  • What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.

What does the evidence suggest about the next five years?

RICS’s survey indicates strong interest but a long path from pilots to embedded practice. Forty percent of respondents named design optioneering as the most significant expected impact area. Scheduling and progress monitoring each received 36%; resource optimisation and contract or document review each received 30%; and risk management received 29%.

A separate Q2 2025 RICS skills survey, with more than 2,000 responses, found that 69% of project managers and 67% of quantity-surveying and construction professionals agreed AI will help surveyors deliver greater value in the future. That is a confidence measure, not a forecast of guaranteed productivity.

Maureen Ehrenberg FRICS CRE, Acting President-Elect of RICS, described the report as a global snapshot of how surveying professionals see AI’s potential, obstacles and preparedness, and stressed that use should support trusted and safe practice, real value and the public good. The practical implication is clear: organisations that improve skills, data quality and accountability can test useful applications; organisations that skip those foundations are likely to scale errors and uncertainty.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is the practical takeaway for a project team?

Use AI to widen and accelerate early analysis, not to remove professional responsibility. Pick a clearly bounded preconstruction task, supply controlled and current data, define success before deployment, preserve an audit trail and compare results with the existing process. Scale only when measured performance, user feedback and governance controls show that the tool improves the complete decision workflow rather than merely producing faster drafts.

Frequently Asked Questions

Does AI reduce construction costs during preconstruction?

The available RICS evidence does not establish that AI has caused lower project costs. It records perceived opportunities and reported adoption, so any savings claim should be demonstrated through a project-specific baseline and independent measurement.

Which project data should be prepared before introducing AI?

Begin with authoritative, revision-controlled drawings, models, specifications, cost codes, schedules and risk registers. Document ownership, permissions, units, location, dates and retention rules so users can tell which information is current.

Can an AI system approve a design or estimate automatically?

Automatic approval is inappropriate for decisions carrying professional, safety, regulatory or contractual responsibility. AI can prepare comparisons or flag anomalies, but a suitably qualified person must verify the evidence and record the approval.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How is AI adoption different for small construction firms?

Smaller firms can start with a narrow workflow and shared templates rather than attempting enterprise-wide integration. They still need confidentiality rules, a named reviewer, reliable source data and a simple baseline for judging whether the pilot helps.