1Fix the driver behind crashes, sound loss and screen glitches2Clear out junk files and repair common Windows errors3Scan for outdated or missing drivers - takes under a minuteiTechGuides is reader-supported. When you buy through links on our site, we may earn an affiliate commission. As an Amazon Associate I earn from qualifying purchases. Learn more
Jackdaw is an offshore gas-condensate field in the United Kingdom Continental Shelf (UKCS) Central North Sea. It lies in Blocks 30/02a, 30/03a and 30/02d, roughly 250 kilometres east of Aberdeen, in about 78 metres of water and close to the UK–Norway median line. The proposed development would use a normally unattended wellhead platform, connect it by subsea pipeline to the existing Shearwater hub, and send processed gas ashore through the Fulmar Gas Line to the St Fergus Gas Plant.
The project is not an onshore gas terminal or a standalone processing plant. It is a field-development scheme whose wells and platform would be integrated with infrastructure already operating in the Central North Sea. The latest UK government record still lists the development matter as “Under Review”, with requests for additional information and developer responses continuing into 2026.
Jackdaw at a glance
| Item | Published detail |
|---|---|
| Resource type | Offshore gas-condensate field |
| Basin and jurisdiction | Central North Sea, UK Continental Shelf |
| Licence blocks | 30/02a, 30/03a and 30/02d |
| Water depth | Approximately 78 metres |
| Distance and direction from Aberdeen | About 250 kilometres east |
| Nearby host installation | Shearwater platform, approximately 30 kilometres to the north-west |
| Published wellhead-platform position | 56°54′01.37″N, 02°22′45.45″E |
| Planned wells | Four, on a not-permanently-attended wellhead platform |
| Export route | Approximately 31-kilometre subsea pipeline to Shearwater, then the Fulmar Gas Line to St Fergus |
| Current regulatory label | Under Review in the latest UK government project record |
What the Jackdaw field is
Jackdaw is a reservoir development rather than a single piece of infrastructure. The field contains natural gas with associated condensate, a light hydrocarbon liquid that can be separated from the produced stream. In practical terms, wells would bring a mixture of gas and liquids to the surface, after which the connected Shearwater facilities would handle the processing needed before export.
Official environmental-statement material records the discovery in 2005. Appraisal drilling and associated evaluation took place between 2007 and 2012. Those dates describe the field’s exploration and appraisal history, not the start of commercial production. A discovery can be known for years before a development plan secures approvals, financing, infrastructure access and a workable operating schedule.
#1 Best Overall
- Powerful Turbo Fan:CAGIWIRU Electric Air Duster have reached speed up to 130000RPM,Can efficient remove dust and debris.With LED light and Three Adjustable Speed to meet with different cleaning tasks.
- With Attached USB C Fasting Charging cable.Charing 3 hours,Enjoy up to 240 minutes of use on the lowest setting, For third speed can use for 25mins.with four charging options to meet with your needs.
- Wide Application: attached 5 different nozzles,making it suitable for a variety of scenes, such as car,pet, pc, keyboards, and other electronic devices. It also serves for office and home clean duster.
- Handy Design & Portable:Cordless air duster electric nozzle is Light weight and small size, design and comfortable to hold and space saving, convenient to carry around. You can put it in your room or inside the car without taking up space.
- Economical &Reusable: Built durable materials with a long-lasting battery,our CAGIWIRU air duster it's a sustainable alternative to disposable air cans.
The proposed concept is deliberately compact compared with a large, permanently staffed offshore complex. The wellheads would be installed on a platform designed not to have people living on it continuously. Operations, surveillance and maintenance planning would therefore rely on remote monitoring and scheduled visits, while production would be routed to an existing processing centre rather than treated through a new onshore plant built solely for Jackdaw.
Where is Jackdaw located?
Its position in the Central North Sea
Jackdaw sits in the Central North Sea portion of the UKCS, one of the offshore areas where several fields, pipelines and production hubs are clustered. The field is on the UK side of the maritime boundary and lies near the UK/Norway median line. “Near the median line” is a geographic description: it indicates proximity to the boundary used to divide offshore jurisdiction, not that the field straddles two countries.
Coordinates and water depth
Adura’s published notice gives the proposed wellhead-platform position as 56°54′01.37″N, 02°22′45.45″E. At that location, the seabed is approximately 78 metres below sea level. That depth is shallow by the standards of many newer deepwater projects, but it is still an offshore environment requiring a fixed platform, subsea equipment, marine construction and dedicated safety systems.
Distance from Aberdeen
The field is about 250 kilometres east of Aberdeen. This is a straight-line offshore distance used to convey geographic position; it is not a sailing time or a distance along a particular vessel route. Weather, vessel speed, offshore traffic and the final logistics plan would determine how long a trip to the installation actually takes.
Rank #2
- Screen Cleaner is Your Screen’s New Bestfriend! - EVEO is proud to present a screen cleaner that’s perfectly suited for your TV. Meet your new screen cleaner, computer screen cleaner, laptop cleaner, iPad cleaner, Macbook,tv cleaner or any other electronic device. Our screen cleaner spray and wipe along with the included plush microfiber cloth, easily removes dust, fingerprints & other smudges on the screen’s surface. Clean effectively for a streak-free screen
- Gentle on your Screens - Our screen cleaner spray and wipes is compatible to be used even for the most sensitive LCD, LED, CRT, and OLED screens in proper use. Be at ease knowing that this product is compatible with all the major brands: LG, SONY, Samsung, Sharp, iPad, iPhone, Android screens, Kindle, PC monitors - we’ve got you covered! Can be used as LCD screen cleaner, tv cleaner, smart tv screen cleaner, and more
- Premium Super Soft Plush Microfiber Cloth - Included in this efficient screen cleaning kit. This screen cleaner spray and wipe has our signature plush microfiber cloth specially designed to comply with screens and monitors and leave them streak-free. Has been shown to effectively absorbs stubborn stains, zero streaks, and no fiber shedding. Always use this together with our screen cleaner for the best results
- Easy-to-Use Screen Cleaner Kit + microfiber cleaning cloth - The EVEO Screen Cleaning Kit will easily be your new favorite tool when it comes to taking care of the things you love most, quick and easy solution for a streak-free screen. Simply screw on the sprayer gun on the screen cleaner bottle. Spray the cleaning liquid onto the microfiber cloth, then wipe the screen until desired cleanliness & shine is achieved.
- Quality Screen Care Kit Worth Purchasing - Enjoy a convenient Screen Cleaner anytime, anywhere you need it. Your satisfaction is our top priority. We stand behind the quality of our products and that’s why, you shouldn’t be worrying at all. We manufacture the Best Screen Cleaner. and can be used for laptop cleaning kit, laptop screen cleaner, tv screen cleaner for smart tv. MacBook screen cleaner, monitor cleaner or screen cleaner spray for electronic devices with microfiber cleaning cloth
Relationship with Shearwater
Jackdaw is approximately 30 kilometres south-east of the Shearwater platform. That proximity is central to the development plan because Shearwater provides the existing hub to which Jackdaw’s production would be tied. The relationship is therefore both geographic and operational: the new field would use a nearby installation instead of requiring a separate processing complex.
How the proposed Jackdaw development would work
1. Drilling four production wells
The plan calls for four wells from the wellhead platform. A wellhead platform supports the well equipment and controls the flow from the reservoir; it is not, by itself, a full gas-processing facility. The number of wells is part of the proposed concept and could only be confirmed as a final operating configuration through the approved development and subsequent field performance.
2. Sending fluids through the subsea tieback
An approximately 31-kilometre subsea pipeline would carry the produced stream from the Jackdaw platform to Shearwater. A tieback of this kind can reduce the need for duplicate processing and export infrastructure, but it also makes the new field dependent on the host hub’s availability, pipeline capacity, maintenance schedule and operating conditions.
Windows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallOutdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware match3. Processing at Shearwater
At Shearwater, the gas-condensate stream would be processed using the hub’s facilities. Processing separates and conditions the hydrocarbons so that the gas can enter the export system and the associated liquids can be managed within the approved operating arrangement. The field’s wellhead platform would therefore be only one part of a chain extending from the reservoir to the onshore terminal.
Rank #3
- 【Large size】:Measuring 800 x 300 mm/ 31. 5×12 inches, which is wider and taller than others. Large mouse pad can perfectly fit your keyboard and mouse of any size, and there is also ample space for peripherals such as phones, tablets, etc.
- 【LED backlight mouse pad】:Blade Hawks RGB mouse pad provides 7 static modes and 7 dynamic modes will give you the options you are looking for. Power-off memory function remembers the last lighting mode you selected. The super glow fiber Chroma will give you a colorful gaming setup that you want.
- 【Anti-slip rubber base】:Made from Natural rubber, this gaming mousepad will firmly grip your desktop, allowing you to enjoy the ultimate precision in the games you are most passionate about. It also comes with a texture that enhances this ability even further.
- 【Smooth and waterproof surface】: Micro-textured cloth surface, for extremely precise mouse control and a smooth movement. When liquid splashes on the gaming mouse pad, it forms water droplets and slides down. Will not delay your work or gameplay.
- 【Plug and play】: This mouse and keyboard pad is powered by USB, plug and play, no driver required. One button control light modes. Press one time to change the lighting mode, press twice to change the brightness, press and hold about 3 seconds turn ON/OFF.
4. Exporting gas to St Fergus
After processing, the gas would travel through the Fulmar Gas Line to the St Fergus Gas Plant on the Aberdeenshire coast. St Fergus is the onshore receiving point identified for this route. This arrangement means Jackdaw’s offshore production would be connected to established UK gas infrastructure rather than delivered to a new, Jackdaw-only landfall facility.
Why the project matters to UK gas supply
Shell UK stated in 2022 that Jackdaw could account for around 6.5% of UKCS gas production at peak and provide an energy equivalent to heating more than 1.4 million UK homes. Both figures are projections attributed to Shell UK, not measurements of production already achieved. “At peak” also matters: it describes the field’s expected maximum contribution, not a guaranteed percentage maintained throughout its life.
The homes comparison converts an energy estimate into a familiar household reference. It does not mean that Jackdaw would supply gas directly to a fixed list of homes, nor does it establish how much of the gas would be consumed in any particular region. Actual output would depend on reservoir performance, commissioning, operating decisions, maintenance and the wider UKCS production system.
Using the Shearwater hub and the Fulmar Gas Line is significant because the project is designed around existing infrastructure. Reusing a host platform and export route can avoid constructing an entirely new processing and landfall chain. It also creates dependencies: capacity, integrity, shutdowns and the remaining operating life of the host and pipeline become relevant to Jackdaw’s schedule and economics.
Rank #4
- 【Softer and More Comfortable】Vaydeer wrist rest has unique diamond pattern, which is the combination of softness and aesthetics. The materials of wrist rest are improved into higher quality memory foam and covered with silky smooth lycra. The computer wrist rest makes you as comfortable and cushiony as like rest your wrists on clouds.
- 【Ergonomic Wrist Saver】The wrist rests for keyboard and mouse comes with a 17.32×3.15×0.83 inch keyboard wrist pad and a 5.94×3.15×0.83 inch mouse wrist support. Based on ergonomic design, the unique concave shape is the perfect fit for your wrist joints. The wrist rest pad fits most computer keyboards and laptops, improve hand and wrist posture, release your wrist and arm stress.
- 【Non-Slip Rubber Bottom】Featuring an anti-skid silicone base on the bottom, this wrist keyboard support stays firmly in place on your desk, preventing the padding from sliding around, ensuring stable and consistent wrist support during extended computer sessions.
- 【Better Experience & Pain Relief】Our keyboard arm rest is beneficial to alleviate the soreness caused by direct contact and friction between your arm and a hard desk surface, reducing the risk of wrist fatigue or carpal tunnel. The soft texture of memory foam can evenly distribute the pressure around your wrists and provide good support with just enough give.
- 【Helpful in Multiple Scenarios】Whether you're working, studying, writing, typing, gaming, this keyboard and mouse rest combo is an essential accessory to add comfort and support to your hands and wrists. It’s also a great gift for men, women, family, friend, coworker, gamer, teacher, etc.
Who is developing Jackdaw?
The project’s corporate description has changed as ownership and operator arrangements have evolved. The updated assessment says a Shell–Equinor transaction formed Adura. Following National Subsea and Petroleum Authority (NSTA) consent to assignment on 1 October 2025, UK North Sea Limited became the Jackdaw developer for the environmental-statement process from 1 November 2025.
A later Adura notice identifies Adura Operations Limited in the project application. These references describe different points in the project’s corporate and regulatory record rather than proving that the field has two independent developments. Readers should check the date and document context when interpreting a company name: a party named in an application, an environmental-statement developer and an operating company can reflect different legal roles during a transaction or assignment.
The NSTA consent date is important because an ownership or licence assignment is not complete merely because a transaction is announced. Regulatory consent determines when the relevant rights and responsibilities move within the UKCS framework. The 2025 dates therefore provide the current context for documents that previously referred to Shell or an earlier project structure.
What is the project’s regulatory status?
The latest UK government project record labels the Jackdaw Field Development matter “Under Review.” The record lists requests for further information and responses from the developer continuing into 2026. That status means the public process had not reached a final, unconditional outcome in the latest update.
Best Value
- 【No Drill Mounted】Cable management tray can be assembled in as little as 3 minutes or less-simply. Side clips easily clampe the edge of desk, pass through the holes on the sides, and secure excess cables with baskets. Desk cable management supports inward or outward installation to meet your needs in different scenarios, and provides you with great convenience when collecting and organizing wires.
- 【Rubber Pad Protects Desk】Wire organizer under desk built-in soft rubber pads on the clamp protect your desk from scratches, so you will not damage your furniture or office.
- 【Sturdy and Beautiful】Cord management under desk is made of high-quality carbon steel and holds about 15 lbs. The wire basket has 2 holes on each side of the tray to enable your cables to pass freely. Cable baskets are suitable for desk thickness use from 0.4" to 2.4".
- 【Space Saving & Keep Organized】Desk cable management tray holds all your power cords, outlet strips, USB hubs and computer transformers hidden from your feet, and the data cables will not enter the vacuum cleaner to keep your desk clean and tidy. Desk wire organizer is also suitable for use in the kitchen and outdoors.
- 【Reduce Safety Risks】Cable tray under desk keeps all plugs away from your kids, no more worry about tripping. Using 2 holes wire tray saves extra space, helps you easily cabling and wire protection. The mesh design is not easy to accumulate dust, but avoids safety accidents caused by messy wires.
“Under Review” should not be read as either an approval or a rejection. It indicates that the competent authorities are assessing the submitted material and seeking clarification or additional evidence. Until the relevant decisions and conditions are issued, the proposed platform, wells, pipeline and production timetable remain a development plan rather than an operating installation.
The environmental statement also has a time dimension. Material prepared in 2021–2022 referred to Shell and an earlier project schedule, while later documents reflect the Adura transaction, the 2025 assignment and information exchanges continuing in 2026. Comparing statements from different years without checking their date can make the ownership, schedule or regulatory position appear inconsistent when the record has simply been updated.
How to interpret maps and descriptions of Jackdaw
Field versus platform
A map may label Jackdaw as a field, a development area or a proposed platform location. Those labels are related but not interchangeable. The field is the subsurface accumulation; the platform is the planned surface facility; and the pipeline and Shearwater hub are separate infrastructure components. The coordinates published for the project identify the proposed wellhead-platform position, not the full underground boundary of the reservoir.
Blocks versus distance
UKCS block numbers identify offshore licensing areas. They are not street addresses and do not describe the field’s distance from shore. For orientation, use the block numbers alongside the Aberdeen distance, the Shearwater relationship and the stated proximity to the UK/Norway median line.
Water depth versus drilling depth
The approximately 78-metre figure describes water depth at the proposed facility. It is not the depth from the sea surface to the gas reservoir and should not be confused with the length of a well. Reservoir depth, well trajectory and geological data are separate measurements.
What Jackdaw is not
- It is not the St Fergus Gas Plant; St Fergus is the onshore destination named for exported gas.
- It is not the Shearwater field or platform, although the proposed development would use Shearwater as its processing hub.
- It is not an onshore gas storage site or a gas-fired power station.
- It is not already producing at the projected peak contribution; the 6.5% and homes-equivalent figures are forecasts attributed to Shell UK in 2022.
- It is not a completed project simply because a location and development concept have been published; the government record remains under review.
Key dates in the project record
- 2005: Jackdaw was discovered, according to the official environmental-statement summary.
- 2007–2012: The field was appraised.
- 2021–2022: Environmental-statement material described the proposed development, its infrastructure concept and the earlier Shell-led project context.
- 1 October 2025: The NSTA consented to assignment associated with the Shell–Equinor transaction that formed Adura.
- 1 November 2025: UK North Sea Limited became the developer for the environmental-statement process, according to the updated assessment.
- 2026: The latest government record continues to show the matter under review, with further-information requests and developer responses.
What readers should check for future updates
Because the project is still under review, the most useful future documents will be those that state a decision date, final conditions, the accepted operator and any changes to the platform, well count, pipeline route or tie-in arrangements. A later approval would not by itself prove that production had started; commissioning, drilling and safe operations would still be separate milestones.
For a reliable reading of any new announcement, identify four details: the publication date, the company named in the document, whether the statement concerns consent or construction, and whether figures are forecasts or measured production. This prevents a projected peak contribution from being mistaken for current UK supply and prevents an older environmental-statement description from being treated as the latest corporate structure.