Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteWhen a wind or solar plant is ready to generate electricity but the grid cannot safely or economically take all of its output, an operator may tell it to reduce production. That operational cut is called curtailment. It can happen when transmission lines are congested, but it is not the same as a proposed plant waiting for permission to connect—and it does not mean a new power line would have prevented every instance.
What curtailment means in practice
Wind and solar output varies with weather and daylight. If available generation exceeds what the grid can use or move under current conditions, the system operator can direct an operating generator to produce less. The difference between what it could have produced and what it actually produces is curtailed potential.
This is not necessarily electricity that was generated and then thrown away. The generator is instructed not to make that electricity in the first place. Curtailment is an operating decision made to keep supply, demand, and the physical limits of the power system in balance.
Why transmission bottlenecks can force a cut
Transmission lines carry electricity from generators to the places where it is needed. Wind and solar resources may be strongest far from major demand centers. If the lines linking those areas to other parts of the grid are at capacity, or a network constraint limits power flows, an operator may be unable to move all available output without violating reliability limits. Reducing generation on the constrained side can be necessary even when customers elsewhere would use more power.
Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Scan for outdated or missing drivers - takes under a minute3Clear out junk files and repair common Windows errors#1 Best Overall
- Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
- Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
- Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
- Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
- 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.
Congestion is not constant. The U.S. Department of Energy’s 2026 draft National Transmission Needs Study says most transmission congestion is concentrated in about 5% of hours. It associates congestion with conditions including high net load, cold weather, high intermittent generation, and large differences between day-ahead and real-time prices. That figure describes the share of hours with congestion, not the share of renewable electricity curtailed.
A congested line can be one cause, but not every curtailment is evidence that a specific transmission project would have carried all the unused output. Grid operators also have to account for reliability, changing supply and demand, and the location and timing of generation. Even with an ideal transmission network, wind and solar availability will not always line up with demand; DOE’s 2023 study says some curtailment is inevitable for that reason.
Rank #2
- 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
- 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
- Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
- 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
- What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.
Curtailment is not the same as waiting to connect
Three situations are easy to confuse:
- Interconnection queue: A proposed project is seeking permission to connect. It has not completed the required studies and connection process, so it is not yet an operating generator supplying the grid. DOE’s overview of queued generation explains that projects undergo impact studies and identifies interconnection process and transmission planning changes as part of the response.
- Operational curtailment: An interconnected generator is operating, but an operator directs it to reduce output under current grid conditions.
- Other operating constraints: Curtailment can occur for reasons beyond a transmission bottleneck, including mismatches between renewable availability and demand or system operating limits.
Improving the interconnection process may reduce delays for projects waiting to connect. It does not, by itself, remove a flow constraint for a plant that is already connected and operating.
What transmission expansion can change—and what it cannot
More or upgraded transmission can increase the amount of power that can move between areas, connect renewable-rich regions to more demand, and let geographically separated resources complement one another. The results depend on where constraints occur, when renewable output is available, and what demand and reliability needs exist. A line can reduce some curtailment without eliminating it.
Rank #3
- Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
- Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
- Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
- Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
- What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
DOE’s 2017 summary of a modeled Western Interconnection scenario for 2050 estimated that about 15.5% of wind energy capacity would go unused without significant transmission expansion. In that scenario, building four proposed transmission projects reduced modeled lost wind generating potential to 7.8%. These are scenario results, not a current nationwide curtailment rate or a forecast that applies to every region.
The same DOE summary reported that Texas wind curtailment ranged from 8% to 17% in 2009–2011, then fell to about 1% after new transmission lines and other upgrades under the Competitive Renewable Energy Zone initiative. Those historical figures illustrate that infrastructure and system upgrades can matter; they do not describe current Texas conditions or prove that transmission alone caused the change.
Rank #4
- Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
- Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
- Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
- Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
- Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
In its 2023 Needs Study, DOE summarized modeling that estimated regional diversification through transmission could reduce curtailment by 45%–90% for grids with 10%–60% renewable generation. That is a modeling estimate tied to those renewable-penetration levels, not a guaranteed outcome for a particular grid or project.
DOE’s 2024 National Transmission Planning Study evaluates economic, reliability, and resilience effects across scenarios. It offers planning insights; it does not select specific line locations or approve individual projects in place of regional planning.
Free tools Windows power users keep installed
One-click scans. No signup required.
Best Value
- 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
- Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
- Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
- HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
- What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
Other ways to use or balance surplus electricity
Transmission is one part of the response. Other options address different constraints and work best when matched to the location and timing of surplus generation.
- Interregional coordination and transmission: Sharing power across a wider area can help balance differences in renewable output and demand. It requires planning and coordination among regions, as well as transmission capability between them.
- Flexible demand: Some electricity use can shift toward periods when renewable output is abundant. This can absorb surplus where the grid and the end use make that possible.
- Storage: Batteries and other storage can shift energy from times of surplus to times of greater need, if the storage is located and operated to serve the relevant grid constraint. Storage does not automatically resolve a transmission bottleneck between a generator and a distant load.
- New electricity uses: Flexible industrial or other loads may make use of power that would otherwise be curtailed, but their location, operating schedule, and ability to respond must match the resource and system need.
- Interconnection improvements: Better study and connection processes can help projects move through the queue; they solve a different problem from congestion affecting an already connected plant.
Why there is no single national curtailment percentage here
The figures above refer to specific historical periods, regions, or modeled scenarios, and they measure different things. The 2026 draft study’s 5% figure is about hours with transmission congestion, not renewable curtailment. The evidence cited here does not establish a current nationwide curtailment percentage, so regional examples should not be treated as a national rate.
The 2026 Needs Study announcement describes the study as a draft open for comments when published. DOE’s FAQ says the Needs Study itself does not designate National Interest Electric Transmission Corridors. Its analysis should not be read as an approval of a line or as a corridor designation.