Suggestions appear as you type. Use the up and down arrows to choose one and Enter to open it.

This page's audience our own tag's counts — open to see them
–Visits
–Page views
–Clicks to vendors
–Time on page
–Reading now
Clicks to vendors, by tool
  • –
Top countries
  • –
Devices
  • –

– · visits, page views and clicks counted by our own tag, which counts more than our checked analytics; every figure rounded down · how we count

Asta Powerproject

#86 of 188 in Project Management Software

Asta Powerproject: A deep scheduling suite for large construction projects, limited by Windows-only coverage. Ranked #86 of 188 in Project Management Software by our editors (3.0/10); pricing: Paid; best for large construction projects needing rigorous scheduling.

3.0/10Editor score
Asta Powerproject3.0 Visit site

At a glance

  • Editor score
    3.0 / 10
  • Pricing
    Paid
  • Best for
    Large construction projects needing rigorous scheduling
  • Free plan
    No
  • Facts checked
    23 Sep 2026
Asta Powerproject screenshot
  • Where it wins

    • Critical-path, dependency, baseline, and scenario planning tools
    • Resource, cost, risk, and progress-period management in one system
    • Integrates with Microsoft Project, Primavera, ERP, BIM, and Office
  • Where it doesn't

    • Windows-only single-user installation option
    • Paid product with no continuing free plan
    • Advanced licence types require quotation or contact

Our verdict on Asta Powerproject

Asta Powerproject is project management software for construction, infrastructure, and related industries. It is designed for planners and project teams that need detailed schedules, task dependencies, critical-path analysis, resources, costs, risks, progress tracking, and reporting. Its focus suits large programmes where schedule control and project-file integration matter more than lightweight task lists or broad platform coverage.

Scheduling is the product’s main strength. Teams can build Gantt-chart schedules, link dependencies, analyse critical paths, compare alternative plans through scenario simulation, and maintain unlimited baselines. Built-in risk analysis, schedule quality checks, progress-period tracking, reports, and business intelligence extend the workflow beyond basic planning. BIM and external project-file integration, along with support for Microsoft Project, Oracle Primavera, Bidcon, ERP systems, BIM tools, and Microsoft Office, make it a fit for construction environments that already rely on specialist planning and business systems.

Licensing covers several operating models. The single-user subscription is installed on one Windows PC, while concurrent licences provide shared access for multiple users. The SaaS licence offers cloud-hosted access from multiple platforms, and Enterprise adds shared real-time project access, project resource sharing, and business-system integration. A free project viewer supports plan sharing, and the product homepage advertises a 14-day trial rather than a continuing free plan. Choose Asta Powerproject when rigorous scheduling, risk control, and programme coordination are priorities. Teams seeking a simpler, broadly accessible project-management tool may find the Windows focus and paid licensing structure less suitable.

Your product? Our editors can test Asta Powerproject in depth and publish a review, labelled as paid · from $149/mo →

Asta Powerproject pricing

Plans Paid No free plan — trial or paid only. Prices checked 23 Sep 2026.
See plans on asta-powerproject.de

All 4 Asta Powerproject plans and prices →

Asta Powerproject fact sheet

Free planNo
Paid fromNot verified
Task viewsNot verified
Automation rulesNot verified
Time trackingNot verified
Guest accessYes
Free-plan user limitNot verified
Native integrationsNot verified
DeploymentDesktop, Cloud
PlatformsWindows, Web
SupportPhone, Docs
Built forSmall business, Mid-market, Enterprise (editorial estimate)
Integrations5 integrations: Microsoft Project, Oracle Primavera, Bidcon, ERP systems, BIM tools
PricingPaid (source)
Websiteasta-powerproject.de
Facts checked23 Sep 2026

Asta Powerproject integrations

Asta Powerproject lists 5 integrations on its own site.

  • Microsoft Project
  • Oracle Primavera
  • Bidcon
  • ERP systems
  • BIM tools

Alternatives to Asta Powerproject

See all Asta Powerproject alternatives →

Used Asta Powerproject? Be the first to review it

The editor score above is our own research. What this page doesn't have yet is a reader's view — what you used Asta Powerproject for, what worked and what didn't. No stars are seeded and no review is paid for; an editor reads every one before it appears.

Write a reviewTwo minutes · verified accounts only · read by an editor before it appears

Reviews come only from verified accounts. Sign in or create an account first — your e-mail is never shown.

Your rating

0 characters · at least 80, up to 3,000

Posted from your verified account. Reviews appear after an editor reads them, usually within two working days.

Featured on iTechGuides

Featured on iTechGuides — Asta Powerproject 3.0/10

Asta Powerproject is listed in our Project Management Software directory. Add the badge to your site — it links back to this page.

<a href="https://www.itechguides.com/products/asta-powerproject/"><img src="https://www.itechguides.com/best/badge/asta-powerproject.svg" alt="Featured on iTechGuides" width="230" height="46"></a>

Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026

Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.

Last updated · How we research and update