Suggestions appear as you type. Use the up and down arrows to choose one and Enter to open it.

This page's audience our own tag's counts — open to see them
–Visits
–Page views
–Clicks to vendors
–Time on page
–Reading now
Clicks to vendors, by tool
  • –
Top countries
  • –
Devices
  • –

– · visits, page views and clicks counted by our own tag, which counts more than our checked analytics; every figure rounded down · how we count

Asta Powerproject review

#86 of 188 in Project Management Software

A deep scheduling suite for large construction projects, limited by Windows-only coverage.

3.0/10Editor score
Asta Powerproject3.0 Visit site

Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026

Asta Powerproject is project management software for construction, infrastructure, and related industries. It is designed for planners and project teams that need detailed schedules, task dependencies, critical-path analysis, resources, costs, risks, progress tracking, and reporting. Its focus suits large programmes where schedule control and project-file integration matter more than lightweight task lists or broad platform coverage.

Scheduling is the product’s main strength. Teams can build Gantt-chart schedules, link dependencies, analyse critical paths, compare alternative plans through scenario simulation, and maintain unlimited baselines. Built-in risk analysis, schedule quality checks, progress-period tracking, reports, and business intelligence extend the workflow beyond basic planning. BIM and external project-file integration, along with support for Microsoft Project, Oracle Primavera, Bidcon, ERP systems, BIM tools, and Microsoft Office, make it a fit for construction environments that already rely on specialist planning and business systems.

Licensing covers several operating models. The single-user subscription is installed on one Windows PC, while concurrent licences provide shared access for multiple users. The SaaS licence offers cloud-hosted access from multiple platforms, and Enterprise adds shared real-time project access, project resource sharing, and business-system integration. A free project viewer supports plan sharing, and the product homepage advertises a 14-day trial rather than a continuing free plan. Choose Asta Powerproject when rigorous scheduling, risk control, and programme coordination are priorities. Teams seeking a simpler, broadly accessible project-management tool may find the Windows focus and paid licensing structure less suitable.

Asta Powerproject pros and cons

  • Where it wins
    • Critical-path, dependency, baseline, and scenario planning tools
    • Resource, cost, risk, and progress-period management in one system
    • Integrates with Microsoft Project, Primavera, ERP, BIM, and Office
  • Where it doesn't
    • Windows-only single-user installation option
    • Paid product with no continuing free plan
    • Advanced licence types require quotation or contact

Asta Powerproject fact sheet, pricing and score →

Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.

Last updated · How we research and update