An owned data center gives your organization control of both the facility and its IT equipment. Colocation lets you keep ownership and control of your servers while renting space and sharing facility infrastructure in a third-party data center. The better fit depends on total cost, power and cooling needs, staffing, capacity, location, connectivity, and how much facility control you require; there is no universal cost winner.
What changes when you choose colocation?
Colocation is not the same as handing your compute workloads to a cloud provider. In a typical colocation arrangement, your organization supplies its own servers and other hardware, then places them in rented space inside a facility owned or operated by another company. Equinix describes colocation as placement of an organization’s hardware in rented space and says customers retain ownership and ultimate control of their servers: Equinix’s colocation overview.
The provider supplies some combination of facility services, which may include power, cooling, communications, and security. The contract determines what is included, how power is metered and billed, what support is available, and what service levels or exclusions apply. Do not assume every colo quote includes the same services.
Which option is cheaper?
Neither model is reliably cheaper for every organization. An owned facility can involve major investment and ongoing responsibility for building systems, power, cooling, maintenance, and operations. Colocation shifts facility responsibilities into a commercial agreement, but your organization still has to account for its servers, migration, contracted services, power charges, staffing, and future expansion.
Free tools Windows power users keep installed
One-click scans. No signup required.
#1 Best Overall
- Save valuable floor space: 6U wall mount server cabinet Dimensions: 13.78" H x21.65" W x17.72" D.Maximum mounting depth is 14.2"
- Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access. Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
- Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punch-out panels for easy cable access
- Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
- PCI & HIPPA and EIA/ECA-310-E compliant
Uptime Institute’s December 2025 cost-comparison report found differing opinions among enterprise owner/operators who compared their own data centers with colocation: 28% of that subgroup (n=231) said workload provisioning was cheaper in colocation, while 42% said it was cheaper in their own data center. These are respondents’ reported perceptions, not measured savings or a prediction for a particular buyer. The survey ran from September 22 through October 31, 2025, and included 850 industry respondents overall; subgroup results are narrower. See the Uptime Institute cost-comparison report.
Build a comparison over the same planning period and workload assumptions. Include facility investment and operations, power and cooling, staff, hardware, migration, expansion, and contract charges. Request site-specific quotes and make sure each option is priced against the same capacity and resilience requirements; the survey does not establish a utilization threshold at which owning becomes cheaper.
Rank #2
- Universal 19” Rack Mount Compatibility – Perfect for pro audio, video, IT, and network gear. Compatible with mixers, routers, patch panels, servers, power amps, and more.
- Heavy-Duty Load Capacity – Built to support up to 550 lbs. Ideal for studio gear, DJ setups, server equipment, and AV components that demand serious stability.
- Robust Steel Frame & Design – Made with 1.5mm thick steel and weighs 36 lbs for maximum durability, reduced vibration, and long-term reliability in any setting.
- Mobile & Secure – Preinstalled with 3” industrial-grade caster wheels (lockable), making it easy to move and position your rack exactly where you need it.
- All-In-One Setup Kit Included – Comes with 34 rack screws (5mm & 6mm), a 1U blank spacer, and an assembly tool—ready for fast installation out of the box.
Compare the options against your requirements
| Decision area | Owned data center | Colocation | What to verify |
|---|---|---|---|
| Control | You own and operate the facility as well as your IT equipment. | You retain ownership and control of your servers, while the provider controls the facility. | Decide whether server control is enough or whether you need authority over building systems and facility operations. |
| Cost and financing | Account for facility investment, operations, power, cooling, staffing, and expansion. | Account for space and facility-service charges, metered power, your hardware, staffing, and migration. | Compare full costs over a consistent time horizon; confirm exactly what the colo rate includes. |
| Power and cooling | You are responsible for providing and operating the facility systems. | The provider supplies facility infrastructure under the agreed service framework. | Establish current and future capacity, rack density, cooling needs, metering, and charges. |
| Resilience and maintenance | You define and operate the design and maintenance approach. | The site has a facility design and service scope that must meet your requirements. | Review maintenance windows, redundancy, fault capabilities, remedies, and the specific site. |
| Capacity and growth | Expansion depends on your facility plans and ability to deliver capacity. | Capacity depends on provider availability at the location and the contract. | Ask how quickly capacity can be delivered and whether it supports planned growth or AI workloads. |
| Energy and sustainability | You can manage facility efficiency and sourcing directly. | Efficiency and energy sourcing depend on the provider and site. | Validate efficiency and renewable-energy claims, including their measurement boundaries. |
| Location and connectivity | You select the facility location and arrange network access. | You select among provider locations and available connectivity options. | Check proximity to users, networks, and partners, plus any applicable location requirements. |
How much should a tier rating influence the decision?
Uptime Institute’s Tier classifications address facility maintenance, power, cooling, and fault capabilities. A tier label can help frame a resilience discussion, but it does not by itself establish that a particular site, service package, or contract meets your needs. Review the actual design and service scope, and confirm the maintenance approach, fault capabilities, and contractual remedies directly. See the Uptime Institute Tier Classification System.
When an owned data center may fit
Investigate ownership when direct control of the facility and its systems is important and your organization can justify the investment and operate the infrastructure. The relevant question is not simply whether you have enough servers: it is whether control, capacity, location, and operating responsibilities justify owning the facility across your planning horizon.
Rank #3
- ADJUSTABLE DEPTH: 4- Post 22U 19" server rack enclosure with 4 vertical rails and adjustable mounting depth 5.7" to 33.0" (14,4cm to 83,8cm); IT rack is compatible with various servers / switches / data / video / AV and other IT networking equipment
- EASY SHIPPING AND ASSEMBLY: Enclosed 22U data rack cabinet ships compact flat-packed to avoid damage and facilitate installation; Include wheels & levelling feet to offer more stability; Home server rack cabinet is only 46.6in (118,3cm) in height
- DESIGN AND VENTILATION: Half height server rack cabinet has lockable and removable door and side panels with vented top allowing airflow; 4 Post 19" rack with 1764lb (800kg) weight capacity (stationary); Computer cabinet rack is EIA/ECA-310-E Compliant
- HARDWARE INCLUDED: Rolling home network rack includes rack mounting and equipment mounting hardware, such as 20 M6 cage nuts / screws, PVC cup washers; Front/rear doors and side panels Keys, 2x allen keys; Rack assembly hardware; Casters and leveling feet
- THE IT PRO'S CHOICE: Designed and built for IT Professionals, this 22U IT Server Cabinet is backed for life, including free lifetime 24/5 multi-lingual technical assistance
- Identify which facility decisions must remain under your control.
- Estimate the people, power, cooling, maintenance, and expansion required to operate the site.
- Model the full cost against the same workload and resilience requirements you would use for a colo quote.
When colocation may fit
Investigate colocation when you want to keep your server hardware but do not want to own or operate the facility that houses it. Provider offerings and available capacity vary by location, so compare specific sites and contracts rather than treating colocation as a uniform service.
- Confirm the exact location, usable power, density, cooling, and resilience characteristics.
- Clarify connectivity, support scope, contract term, power metering, service levels, and exclusions.
- Check how the provider can accommodate growth and whether the facility’s energy claims meet your requirements.
Equinix’s decision framework also calls out scalability, AI workload support, energy efficiency, renewable sourcing, and power usage effectiveness as considerations; these are prompts for evaluation, not guarantees about any particular provider or site. See its data center decision tree.
Rank #4
- DURABLE BUILD: Constructed from high-quality Cold Rolled Steel, the NavePoint Consumer Series 12U network cabinet boasts a sturdy, welded frame. Fitting EIA standard 19” networking equipment, this server cabinet confidently supports up to 110 lbs, providing a resilient base for your vital IT gear and equipment
- CONVENIENT DESIGN: This 12U cabinet features a reinforced, heat-treated, tempered glass front door with a security lock. Perfect for applications requiring both security and accessibility, its compact design of 17.72"L x 21.65"W x 24.42"H offers a practical solution for space-constrained settings.
- EASY & CUSTOMIZABLE EQUIPMENT SET UP - The 12U IT cabinet, with removable side panels and security locks, offers customization at its finest. Whether it's for an efficient device or cable management, this data cabinet ensures secure, adaptable configurations that suit your networking server requirements
- ENHANCED VENTILATION & SECURITY - Built-in fans and flow-through ventilation work to prevent overheating, ensuring optimal operation of your equipment. The reinforced, lockable tempered glass front door not only boosts security but also facilitates easy monitoring of installed equipment.
- SAFETY & COMPLIANCE - All NavePoint products are built to industry standards.
Keep public cloud as a separate comparison
Public cloud changes more than the facility arrangement: it is a separate service model from owning servers in a facility or placing your own servers in colocation. Uptime Institute’s 2025 survey reported that, among respondents who directly compared colocation with public cloud, 47% (n=154) said provisioning workloads was cheaper in colocation and 29% said it was cheaper in public cloud. Those subgroup perceptions do not answer the owned-data-center-versus-colocation question, and they are not individualized cost estimates. The distinction between colocation and public cloud is also described in Equinix’s overview and the Uptime Institute report.
What to prepare before requesting quotes
- Define the workload: list current and planned server capacity, power draw, density, cooling needs, growth rate, and connectivity requirements.
- Set facility requirements: specify resilience, maintenance expectations, location constraints, and any energy or sustainability criteria.
- Choose the control boundary: decide whether your team needs control of facility systems or only of its hardware and configurations.
- Request comparable costs: ask providers to itemize space, power, cooling, connectivity, support, contract term, and other charges. Estimate equivalent facility, staffing, and operating costs for ownership.
- Review obligations and exit options: check service levels, exclusions, remedies, expansion terms, migration responsibilities, and the practical cost of leaving or changing capacity.
If you are deploying physical servers, a server rack cabinet may be relevant to the hardware setup, including in a colo facility. Select equipment only after confirming dimensions, load capacity, cooling requirements, and the facility’s permitted configuration; no particular rack model is established as necessary here.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.