Usually not for the earliest wave of data-center growth. The U.S. Department of Energy (DOE) says widespread commercial deployment of advanced nuclear reactors is likely in the 2030s. New plants could become an important source of power later, but their schedules do not reliably match every data center’s near-term deadline. Existing plants, restarts and a broader mix of electricity sources may help meet demand sooner.
Why the timing question matters
Data-center electricity use is rising quickly, but forecasts are not guarantees. A DOE announcement about a DOE-funded Lawrence Berkeley National Laboratory (LBNL) report said U.S. data centers used 4.4% of the nation’s electricity in 2023 and could account for 6.7%–12% in 2028. LBNL estimated use at 176 terawatt-hours (TWh) in 2023, up from 58 TWh in 2014, and projected 325–580 TWh in 2028. Those 2028 figures are a wide forecast range, not measured future consumption.
The demand is also difficult to serve with national totals alone. Data centers may need dependable electricity around the clock, can add large loads quickly, and often must locate near users or network infrastructure to meet latency requirements. Whether a particular plant can help a particular facility depends on location, grid connections, transmission capacity, and how quickly the facility’s demand grows.
What DOE’s nuclear timeline does—and does not—mean
In an April 2025 explainer, DOE said licensing, demonstrating and deploying additional advanced reactor designs will take years, and placed widespread commercial deployment in the 2030s. This is an agency outlook, not a guaranteed opening date for every reactor design or project. Individual schedules depend on licensing, construction, fuel readiness, financing and connection to the grid.
Free tools Windows power users keep installed
One-click scans. No signup required.
#1 Best Overall
- Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
- Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
- Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
- Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
- 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.
Recent milestones show activity, not electricity already available to data centers. DOE reported that TerraPower’s Natrium project received a construction permit in March 2026 and broke ground the following month. DOE also reported that the Nuclear Regulatory Commission (NRC) was reviewing Dow’s application for an X-energy Xe-100 project. A permit, groundbreaking or application review is not commercial operation, and none by itself establishes when power will reach a customer.
Which nuclear options could help sooner?
“Nuclear power for data centers” can mean several different arrangements. A new reactor, a restarted plant and a contract for output from a plant already operating have different schedules and delivery conditions.
Rank #2
- 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
- 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
- Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
- 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
- What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.
| Option | What it can offer | What determines delivery |
|---|---|---|
| New reactor construction | Potential new, firm generation for later demand. | Licensing, construction, fuel and grid milestones; DOE’s April 2025 outlook places widespread advanced-reactor deployment in the 2030s. |
| Restarting a closed plant | Potentially earlier generation than a new build, if the facility can return to service. | Required upgrades and regulatory approvals, plus the project’s actual status and grid path. |
| Contracting with an operating plant | A way to arrange access to existing generation without building a new reactor. | Contract terms, phase-in, location, transmission and how costs are allocated; a contract does not necessarily mean the generator is co-located with the data center or produces power at the same moment it is consumed. |
Restarts are not new builds
The Energy Information Administration (EIA) reported in October 2024 that Constellation targeted a 2028 restart for Three Mile Island Unit 1 under its agreement with Microsoft. That dated target was contingent on upgrades and federal, state and local approvals; it should not be treated as confirmation that the unit is operating or that its current schedule is unchanged.
An operating-plant contract is not necessarily immediate full output
EIA described an Amazon Web Services (AWS) agreement for up to 960 megawatts (MW) from the operating Susquehanna plant. The arrangement phases capacity in 120-MW increments over multiple years and includes a one-time option to cap the amount at 480 MW. The headline maximum is therefore not the same as power delivered immediately: the phase-in and contract terms matter.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Rank #3
- Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
- Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
- Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
- Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
- What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
Why a power deal does not settle grid delivery
A power purchase agreement (PPA) does not necessarily require the generator to sit beside a data center or deliver electricity at the same time the facility uses it. The contract, the generator’s output, and the electricity that can physically reach a site are related but distinct. Proposed co-location arrangements can also raise questions about who pays grid charges and how system costs are allocated.
For a specific project, the practical questions are whether generation and the data center can connect to the grid on the required schedule, whether transmission can carry the power, and how the facility’s load ramp compares with the supply arrangement. A plant’s nameplate capacity or a contracted MW figure alone cannot establish that a particular site will receive all the electricity it wants at a given hour.
Rank #4
- Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
- Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
- Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
- Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
- Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
What can bridge demand before new reactors are widely available?
DOE points to a portfolio rather than a single near-term replacement for nuclear. Existing generation, grid expansion, energy storage, efficiency and more flexible demand can contribute, while wind and solar are among the options that can scale more quickly. Nuclear and next-generation geothermal can be part of the longer-term clean firm-power picture. None of these options guarantees adequate supply in every region: local generation, interconnection and transmission constraints still matter.
These resources also serve different roles. Solar and wind can add generation, while storage can shift electricity across time; efficiency and demand flexibility can reduce or reschedule some load. Their usefulness for an individual data center depends on the facility’s operating requirements and the electricity system serving it. A portfolio can address timing and system fit more effectively than assuming one new plant will meet every site’s needs.
Quick wins for a faster PC:
Repair Windows errors before they cause bigger problemsFix Now →Scan for outdated or missing drivers - takes under a minuteDriver Scan →Clear out junk files and repair common Windows errorsFree Scan →Best Value
- 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
- Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
- Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
- HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
- What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
How to assess a proposed nuclear supply plan
For a data-center project, separate the expected date and amount of generation from the date and amount of power the site can actually receive. Ask for evidence on the following points:
- Project stage: Is the reactor proposed, in licensing, permitted, under construction, restarting, or already operating?
- Delivery schedule: What is the expected service date, and which licensing, construction, fuel or approval milestones remain?
- Quantity and timing: Is the MW figure a maximum, a phased commitment, a cap, or a firm delivery quantity at specified times?
- Grid fit: Are interconnection and transmission arrangements in place to serve the site’s location and load ramp?
- System and contract costs: Who pays for grid upgrades and charges, and how are costs allocated if the arrangement involves co-location?
- Contingencies: What happens if the plant, grid connection or data-center load is delayed or changes?
There is no universal cost winner established across technologies, electricity markets and sites. A schedule or supply claim is most useful when it identifies the facility, the delivery path, the committed quantity and the conditions that could change the date.
Quick Recap