Neither public cloud nor colocation is universally cheaper. Cloud costs depend on usage, storage, and data transfer; colocation shifts more of the bill toward hardware, facility capacity, power, networking, and the people who operate it. A fair comparison prices the same workload over the same period, then tests how the result changes as utilization, traffic, and power costs move.

What organizations report about the cost comparison

In Uptime Institute’s 2025 Data Center Spending Survey, 154 respondents who directly compared colocation facilities with public cloud gave no single answer: 47% said colocation was cheaper for provisioning workloads, 29% said public cloud was cheaper, and 22% said costs were roughly equivalent. The figures describe respondents’ assessments, not a universal price benchmark; the difference between the total and 100% may reflect rounding.

The practical takeaway is to compare a specific workload, location, service level, and time horizon. A provider’s advertised instance or rack rate alone cannot settle the question.

What belongs in each side of the comparison?

Public cloud: usage plus the services around it

AWS identifies compute, storage, and outbound data transfer as three fundamental cost drivers. In practice, a workload estimate may also need block, object, and database storage; snapshots and backups; managed-service or control-plane charges; load balancing; observability; support; software licenses; and migration or exit work. Include transfers between zones or regions as well as data sent to the internet.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Tecmojo 12U Open Frame Network Rack for IT & AV Gear, AV Rack Floor Standing or Wall Mounted,with 2 PCS 1U Rack Shelves & Mounting Hardware,Network Rack for 19" Networking,Audio and Video Device
  • 【Powerful Load-bearing】12U Network Rack Open Frame is constructed from durable cold rolled steel; Rack shelf supports enhance stability, wall-mounted capacity of 130lbs, the ground-mounted up to 260lbs
  • 【Considerate Designs】Open-frame layout, including a top panel adding space, anti-slip shelf stops fixing devices and compatible racks for stack and expansion to meet requirements of home server rack
  • 【Complete Accessories】A 12U open frame server rack, two ventilated shelves, four shelf stops, four velcro straps and a set of equipment mounting screws
  • 【Versatile Application】Ideal for space-efficient multi-device setups in warehouses, retail, classrooms, offices and more; Excellent choices as AV Rack/IT Rack
  • 【Effortless Setup】 Network Rack includes hardware, a comprehensive manual, mounting hole drilling template and an online assembly video to simplify setup

Pricing depends on provider, service, region, and date. Discounts for reserved or committed use can change the compute estimate, but compare them against realistic demand and the commitment period rather than assuming every hour will qualify.

Colocation: equipment, facility, and operating responsibility

Colocation commonly means the organization supplies and operates its own servers and networking equipment in a third-party data center. Its model should include server and network hardware purchase or financing, depreciation, rack or cage fees, metered or committed power, cooling pass-throughs, bandwidth or transit, cross-connects, and remote-hands charges. Add maintenance, replacement parts and spare capacity, software, physical security, insurance, monitoring, staff time, and travel where relevant.

Rank #2
Tecmojo 6U Wall Mount Server Cabinet IT Network Rack Enclosure Lockable Door and Side Panels Black, Cooling Fan, Standard Glass Door, 450mm Depth, for 19” IT Equipment, A/V Devices
  • Save valuable floor space: 6U wall mount server cabinet Dimensions: 13.78" H x21.65" W x17.72" D.Maximum mounting depth is 14.2"
  • Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access. Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
  • Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punch-out panels for easy cable access
  • Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
  • PCI & HIPPA and EIA/ECA-310-E compliant

AWS’s comparison framework considers EC2, dedicated in-house hardware, and colocation as distinct options. In a hybrid design, network costs also depend on where the cloud connection lands: AWS notes that when equipment and the cloud point of presence are in the same colocation facility, the connection may cost as little as a cross-connect. That is not a general price for all connectivity; confirm the facility, provider, port, and traffic charges in a quote.

How data transfer changes the answer

Data-heavy systems can have a materially different cost profile from workloads that mostly compute and store data in one place. Hybrid connectivity may combine provisioned network resources, usage-based transfer and processing, and connection fees. Map the actual route and direction of traffic: internet egress, inter-zone or inter-region transfer, cloud-to-colocation traffic, and replication can be priced differently.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
Tecmojo 12U Wall Mount Server Cabinet IT Network Rack Enclosure Lockable Door and Side Panels Black,Cooling Fan,Glass Door,17.7inch Depth,for 19” IT Equipment,A/V Devices
  • Save valuable floor space: 12U wall mount server cabinet Dimensions: 24.25" H x21.65" W x17.72" D. MAXIMUM MOUNTING DEPTH is 14.2".
  • Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access; Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
  • Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punchout panels for easy cable access
  • Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
  • PCI & HIPPA and EIA/ECA-310-E compliant

Provider examples illustrate why the estimate must be regional and current. Google Cloud’s pricing page lists Premium Tier internet egress to North America and Europe destinations at $0.12/GiB for the first 1,024 GiB per month. Microsoft Azure documents a 100 GB/month free internet-egress allowance across Azure regions and says egress from Azure to another cloud or on-premises is free. These are provider-specific terms, not directly interchangeable allowances: check destination, tier, service, and current terms for the workload being priced.

Build a like-for-like total cost model

  1. Describe monthly demand. Record CPU or GPU capacity, memory, storage capacity and performance, IOPS, inbound and outbound traffic, growth, and the required availability and recovery targets. Use a month-by-month profile if demand changes materially.
  2. Choose a common horizon. Three to five years is a useful planning window for comparing recurring cloud consumption with hardware that must be purchased, financed, or replaced. State utilization assumptions and model expected refresh timing rather than treating hardware as perpetual.
  3. Price the cloud design. Estimate compute at the expected utilization and applicable discounts, then add storage, backups, managed services, load balancing, monitoring, licenses, support, and each relevant transfer path. Use prices for the intended region and the date of the estimate.
  4. Price the colocation design. Annualize or finance equipment cost over the chosen horizon, then add facility fees, power, connectivity, labor, maintenance, spares, software, insurance, and redundancy. Account for capacity that must be installed ahead of demand or kept unused for resilience.
  5. Add transition and failure costs. Include migration, data exit, contract termination where applicable, and the cost of downtime or recovery assumptions. Keep one-time transition costs separate from recurring monthly charges so they are not mistaken for steady-state spend.
  6. Run sensitivities and report a range. Recalculate with lower and higher utilization, power prices, bandwidth volumes, growth, and hardware-refresh costs. Present the assumptions and range; a single break-even month can imply more certainty than the inputs support.

A useful summary is total cost over the horizon, with one-time costs shown separately, divided by the workload delivered over that same period. The denominator matters: compare equivalent capacity, performance, availability, and recovery expectations, not simply server counts or monthly invoices.

Rank #4
Sale
StarTech 42U 4-Post Open Frame Rack, 19in, 22-40in, 1323lb/600kg
  • ADJUSTABLE DEPTH: 4-Post 42U open frame server rack with 4 vertical rails and adjustable mounting depth 22" to 40" (56,0cm to 101,7cm); Compatible with various servers / switches / data / AV and other IT equipment; EIA/ECA-310-E Compliant
  • EASY ASSEMBLY: Mobile network rack with easy-to-follow assembly instructions and online video; Compact flat-pack shipping to avoid damage and facilitate installation; Total product height of 80.3in (204 cm) with casters, 78in (198cm) without casters
  • COLD ROLLED STEEL: Durable 4 Post 19in open frame rack designed for ventilation with 42U mounting height and 1320lb (600kg) weight capacity (stationary); 3 install options included: casters, levelling feet, or base-plate to secure rack to the floor
  • HARDWARE INCLUDED: Rolling computer/data rack includes cage nuts and screws to mount equipment, easy to read Units (U) and depth adjustment markings, cable management hooks for organization, and required assembly tools
  • THE IT PRO'S CHOICE: Designed and built for IT Professionals, this 42U rack is backed for 2-years, including free lifetime 24/5 multi-lingual technical assistance

When each model is more likely to fit

Workload or requirement Cost tendency to test Why it matters
Uncertain, bursty, or rapidly growing demand Public cloud may have an advantage Capacity can be provisioned without buying the full peak hardware footprint up front; actual cloud usage and service charges still need to be modeled.
High, steady utilization over several years Colocation may improve as an option Owned hardware can be amortized across sustained demand, if facility, power, network, staffing, and refresh costs do not outweigh the savings.
Large or frequent data movement Depends on traffic paths and local connectivity quotes Egress, processing, transit, and cross-connect charges can change the result substantially.
Fast geographic expansion or short-lived capacity needs Cloud may be operationally simpler to scale Building or installing physical capacity takes planning; cloud reach and service availability still vary by region.
Strict data locality, compliance, or physical-control requirements No automatic cost winner Compare the actual eligible architectures and required controls; compliance and locality constraints can narrow the feasible choices.
Limited infrastructure operations staff Cloud may reduce hardware-operating work, but not eliminate operations Colocation places equipment maintenance and capacity management on the customer; cloud still requires service, security, and cost management.

These are starting hypotheses, not substitutes for quotes. Contract flexibility, disaster recovery design, and the cost of leaving a provider can alter the result as much as headline compute or rack pricing.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Account for power volatility in colocation estimates

Power deserves its own sensitivity case rather than being buried in a fixed facility-rate assumption. Uptime Institute’s 2025 reporting on its 2024 survey found that 70% of enterprise owner/operators identified power as a leading unit-cost increase, compared with 34% identifying bandwidth. This is a report of cost increases named by respondents, not a forecast or a price applicable to every facility.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Best Value
Tecmojo 16U Open Frame Network Rack for IT & AV Gear, AV Rack Floor Standing or Wall Mounted,with 2 PCS 1U Rack Shelves & Mounting Hardware,Network Rack for 19" Networking,Audio and Video Device
  • 【Powerful load-bearing】 Constructed from durable Cold Rolled Steel, Rack Shelf Back Support enhances stability, wall-mounted capacity of 130lbs, the ground-mounted up to 260lbs
  • 【Considerate Designs】Open-frame layout, including a top panel adding space, Anti-Slip Shelf Stops fixing devices and compatible racks for stack and expansion to meet requirements of home server rack
  • 【Complete Accessories】A 16U open frame server rack, two ventilated shelves, four shelf stops, four velcro straps and a set of equipment mounting screws
  • 【Versatile Application】Ideal for space-efficient multi-device setups in warehouses, retail, classrooms, offices and more; Excellent choices as AV Rack/IT Rack
  • 【Effortless Setup】 Network Rack includes hardware, a comprehensive manual, mounting hole drilling template and an online assembly video to simplify setup

Ask whether a colocation quote uses metered consumption, a committed power allocation, or another billing basis, and whether cooling or power-related adjustments can change over the contract term. Re-run the model at different power costs before treating a hardware-based estimate as stable.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.