There is no single U.S. electricity price for data centers, and their effect on other customers’ bills depends on where they connect, how they use power, and how local costs are assigned. National electricity prices by customer class show that industrial customers pay less on average than commercial customers, but data centers are not reported as a separate class. To compare data centers fairly with factories or other large loads, separate the customer’s bill from the cost and reliability effects of serving it.

What makes a fair comparison?

Annual electricity use tells you how much energy a facility consumes, but not what it costs to serve. Two facilities using the same number of megawatt-hours can have different bills and grid effects if one draws power steadily and the other creates a sharp peak, or if they connect in different places.

A useful comparison accounts for:

  • Annual energy: MWh or TWh consumed over a stated period.
  • Peak demand and load shape: The facility’s maximum MW draw, how demand changes by hour, and whether the load can shift or curtail use.
  • Location and grid capacity: Available generation, transmission and distribution capacity, interconnection requirements, and the regional market.
  • Customer charges: Energy rates, demand or capacity charges, delivery charges, contract terms, and any on-site supply.
  • Cost and risk allocation: Who funds new infrastructure, who bears the risk if a project uses less power than forecast, and what protections apply to other customers.
  • Reliability and generation: Whether enough resources are available during peak hours and which resources serve the additional load.

Without those details, a comparison of yearly energy totals or average cents per kWh cannot show which facility is cheaper to serve or who ultimately pays for grid investment.

How much electricity do data centers use?

Data-center demand is large and projected to grow, but published estimates depend on the forecast vintage and assumptions. The figures below come from two different analyses and should not be treated as one continuous forecast.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Sale
Elebase USB to USB C Adapter for iPhone 18 Pro Max,USBC Car Charger Adapter
  • Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
  • Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
  • Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
  • Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
  • 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.
Estimate Electricity use or share Source and qualification
2023 estimate 176 TWh, about 4.4% of U.S. electricity U.S. Department of Energy (DOE), 2024, summarizing Lawrence Berkeley National Laboratory’s (LBNL) 2024 report.
2028 projection 325–580 TWh, approximately 6.7%–12% of projected U.S. electricity DOE, 2024, summarizing LBNL’s 2024 report; a broad projected range, not an observed outcome.
2030 reference case 11.8% of U.S. electricity LBNL’s 2025 update, reference-case projection.
2030 scenario range 9.5%–15.3% of U.S. electricity LBNL’s 2025 update, range across scenarios.

The 2028 range and the 2030 figures come from separate forecast vintages, so they are not directly interchangeable. A projected national share also does not reveal how much generation or network capacity will be needed at a particular location or hour.

Do data centers pay more for electricity than factories?

National retail averages do not establish what a data center pays. The U.S. Energy Information Administration (EIA) reports prices by broad customer class; data centers are not a separate category in the figures below.

Customer class Average retail price
Residential 17.30¢/kWh
Commercial 13.41¢/kWh
Transportation 13.83¢/kWh
Industrial 8.62¢/kWh

These are EIA’s preliminary 2025 national averages, published using preliminary February 2026 Electric Power Monthly data. They describe customer classes, not individual facilities or contracts. The industrial average is lower than the commercial average, but it does not show that a data center pays the commercial average—or that it pays more or less than a particular factory.

Rank #2
Sale
Anker USB-C Hub, 5-in-1 USB Hub for Laptops, 4K HDMI Multiport Adapter
  • 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
  • 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
  • Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
  • 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
  • What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.

EIA notes that industrial customers typically use more electricity and may receive service at higher voltages, which can make delivery more efficient and less expensive. Industrial retail prices are generally closer to wholesale prices; local generation costs and other conditions also affect retail rates. A facility’s actual bill can include energy, demand, capacity, transmission and distribution charges, and terms specific to its service arrangement.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Can large data-center loads affect grid prices?

They can contribute to demand growth, but a modeled wholesale-price effect is not the same as a change in retail rates, and it does not prove that data centers caused a particular customer’s bill to rise. EIA reports that U.S. electricity demand grew about 1.7% per year during 2020–2025, compared with 0.1% per year during 2005–2019. It identifies data centers as one contributor to recent growth and expanded industrial electrification as another.

In a February 2026 high-demand scenario, EIA modeled faster load growth while holding future generating capacity to the outlook in its February Short-Term Energy Outlook (STEO). The modeled 2027 wholesale-price effects differed substantially by region:

Rank #3
Sale
Anker USB C Hub, 7in1 Multi-Port USB Adapter, 4K@60Hz USBC to HDMI Splitter
  • Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
  • Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
  • Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
  • Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
  • What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
Region Modeled 2027 wholesale-price result How to interpret it
ERCOT $37/MWh, or 79%, above the February 2026 STEO forecast EIA high-demand scenario; a conditional model result, not an observed retail-price increase.
PJM $2.60/MWh, or 4%, above the February 2026 STEO forecast The same high-demand scenario; EIA described the response as more limited, in part because PJM is interconnected with other eastern regions and has access to more generation.

The regional contrast is the point: the effect of additional load depends on the grid and market serving it, as well as the amount and timing of demand and the generation assumed to be available. EIA cautions that later forecasts may differ from the February 2026 assumptions.

Who pays for grid upgrades for data centers?

There is no single allocation rule or settled nationwide outcome in the cited material. A large new load may require generation, transmission, distribution, interconnection work, or additional resources to maintain reliability. Rates, contracts, and regulatory safeguards determine how those costs and investment risks are divided between the customer and other ratepayers.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

DOE’s 2025 rate-design brief identifies several issues in designing tariffs for large loads:

Rank #4
Sale
UGREEN USB to USB C Adapter Combo 4-Pack, 10Gbps USB C Converter Space Gray
  • Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
  • Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
  • Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
  • Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
  • Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
  • Assigning system costs fairly and reducing the risk that other customers pay for infrastructure built for a project that does not materialize or use as much power as expected.
  • Maintaining resource adequacy as demand grows.
  • Sharing technology and investment risks appropriately.
  • Accounting for flexibility and options such as carbon-free supply.

These are questions for rate design and project-specific arrangements, not evidence that every data center shifts costs to other customers—or that every project pays all costs it creates.

FERC’s large-load proceeding

On June 18, 2026, the Federal Energy Regulatory Commission (FERC) announced orders directing all six regional transmission organizations and independent system operators under its jurisdiction to justify or reform rules for data centers, manufacturing facilities, and other large energy users. The issues include transmission study processes, transparency intended to prevent cost shifting, co-location and behind-the-meter generation, flexible-load transmission service, and how to study generation serving nearby or co-located loads. This is an active regulatory process, not a settled national tariff.

Pacific Northwest National Laboratory’s 2026 review also describes state and federal policy activity on large-load interconnection, rate structures, deployment, and potential cost shifts. Selected policy activity does not establish a uniform outcome for every utility, state, or customer.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Best Value
Sale
Anker USB C Hub, 5-in-1 USBC to HDMI Splitter with 4K Display
  • 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
  • Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
  • Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
  • HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
  • What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How to assess claims about data centers and electricity bills

When evaluating a claim that data centers are making electricity cheaper or more expensive, check what is actually being compared:

  • Is the figure a bill or a system cost? A customer’s tariff is not the same as the cost of generation, network upgrades, or reliability resources.
  • Is it wholesale or retail? Wholesale market prices do not translate one-for-one into every customer’s retail rate.
  • Does it match the place and time? A national annual average cannot establish an effect in a particular utility territory or during peak hours.
  • Are the loads comparable? Compare peak MW, hourly profile, voltage, flexibility, contract, and local grid conditions—not only annual MWh.
  • Who bears the investment risk? Look for the tariff or contract provisions that allocate upgrade costs and address a project that is delayed, downsized, or underused.

The available national figures do not provide matched facility-level bills or attributable grid costs for data centers versus specific sectors such as steel, aluminum, refining, or hydrogen production. A defensible comparison across those industries would need consistent locations, voltage levels, load profiles, tariffs, contracts, and accounting boundaries.