Data centres use electricity to run servers, storage and networking equipment—and to keep that equipment cool and reliably powered. Water can be consumed directly for cooling or indirectly when power plants generate the electricity a facility uses. Land is needed for buildings and supporting infrastructure, but the sources cited here do not establish a consistent global total for data-centre land use. The amounts vary with facility design, climate, workload, local electricity supply and the boundary used to count each resource.

Why data centres use so much electricity

Every digital service that stores or processes information depends on physical equipment. Servers and accelerators perform computation; storage devices hold data; and networking equipment moves it. Those devices draw electricity while operating. Power-conversion equipment, cooling, lighting and other facility systems add to the site’s demand.

Almost all the electricity used by computing equipment ultimately becomes heat. If that heat is not removed, equipment can overheat or fail, so data centres use cooling systems alongside power conditioning and, often, backup systems to support continuous operation. The International Energy Agency (IEA) estimates that global data-centre electricity consumption was 415 terawatt-hours (TWh) in 2024, about 1.5% of the world’s electricity use. Its 2025 base case projects consumption of about 945 TWh in 2030; that is a scenario, not a guaranteed outcome. IEA, Energy and AI: Energy demand from AI.

Consumption and generation figures are not interchangeable

The IEA also describes electricity generation serving data centres, estimating 460 TWh in 2024 and projecting more than 1,000 TWh in 2030. That is a separate measure from its estimate and projection of data-centre electricity consumption. The figures use different accounting concepts, so they should not be combined into one forecast. IEA, Energy and AI: Energy supply for AI.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Sale
Elebase USB to USB C Adapter for iPhone 18 Pro Max,USBC Car Charger Adapter
  • Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
  • Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
  • Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
  • Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
  • 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.

Why cooling adds to electricity demand

Cooling takes electricity to move heat away from equipment, but its share of a facility’s use depends on the building and its systems. The IEA reports that cooling accounts for about 7% of electricity use in efficient hyperscale data centres, compared with more than 30% in less-efficient enterprise centres. These are examples at different ends of a range, not a universal percentage for every data centre. IEA, Energy and AI: Energy demand from AI.

Cooling technology and climate matter: a system that works well in one setting may not be the best choice in another. Facility efficiency matters too. This is why comparisons are most useful when they match the facility type, location, year and workload rather than treating all data centres as equivalent.

Rank #2
Sale
Anker USB-C Hub, 5-in-1 USB Hub for Laptops, 4K HDMI Multiport Adapter
  • 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
  • 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
  • Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
  • 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
  • What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.

Where data-centre water use comes from

Water use has two distinct boundaries. Direct, or site, water is used at the data centre, including in some evaporative cooling systems. Indirect, or source, water is consumed in producing the electricity that powers it. A water-use figure that counts only one boundary does not describe the other.

Water boundary What it counts Why it varies
Direct (site) Water consumed at the facility, including for evaporative cooling where used. Cooling design, operating conditions and local climate affect use.
Indirect (electricity supply) Water consumed in generating the electricity used by the facility. It depends partly on the electricity sources serving the facility and their water intensity.

There can be a trade-off between these boundaries. An air-cooled chiller may use no water at the facility while requiring more electricity than a water-cooled alternative. The indirect water impact of that extra electricity depends on the grid supplying it. The Lawrence Berkeley National Laboratory’s 2024 U.S. data-centre report discusses these system boundaries; its estimates are U.S.-specific and should not be presented as global totals. Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
Sale
Anker USB C Hub, 7in1 Multi-Port USB Adapter, 4K@60Hz USBC to HDMI Splitter
  • Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
  • Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
  • Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
  • Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
  • What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.

Why there is no universal water figure per workload

A 2025 review by Nuoa Lei, Jun Lu, Arman Shehabi and Eric R. Masanet found that workload-level water use varied by more than 10,000-fold across the conditions studied. The review identifies server efficiency and utilization, idle equipment, cooling system, facility efficiency, climate, electricity-generation water factors and equipment refresh cycles as relevant determinants. A single figure for water per query or per data centre would therefore be misleading unless its workload, location, cooling design and accounting boundary were specified. Lei et al., The water use of data center workloads: A review and assessment of key determinants.

Why data centres need land—and why local siting matters

Data centres need a physical site for buildings, servers, cooling equipment and other infrastructure. They also need access to substantial, reliable power and supporting connections. Location can be constrained by the need to serve users with suitable latency, while a large or rapidly growing electricity load can affect regional grids.

Rank #4
Sale
UGREEN USB to USB C Adapter Combo 4-Pack, 10Gbps USB C Converter Space Gray
  • Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
  • Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
  • Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
  • Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
  • Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft

The U.S. Department of Energy’s December 2024 summary of a national report said U.S. data-centre load growth had tripled over the prior decade and was then projected to double or triple by 2028. That was a projection made in 2024, not a current measurement or the latest forecast. It illustrates why the impact of a facility can be significant for its local power system even when global electricity shares appear modest. U.S. Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers.

There is no consistent global land-footprint total established by the sources cited here. A land estimate would need to state what it counts: the building parcel, a larger campus, substations and transmission, power-generation sites, or a broader supply chain. Those boundaries describe different impacts, so a single universal land-per-data-centre figure would not be meaningful without a defined method.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Best Value
Sale
Anker USB C Hub, 5-in-1 USBC to HDMI Splitter with 4K Display
  • 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
  • Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
  • Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
  • HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
  • What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What makes resource use differ from one data centre to another

  • Workload and utilization: the amount and type of computing performed, and how much installed equipment is actually in use, affect electricity demand and workload-level water estimates.
  • Equipment and facility efficiency: server efficiency, power systems and cooling overhead influence how much electricity is needed for a given computing task.
  • Cooling design and climate: these shape direct site-water use and the electricity required to remove heat.
  • Electricity supply: the generation mix affects indirect water use, while the power available at a suitable location influences siting.
  • Accounting boundary: electricity consumed at a facility is not the same measure as generation serving it; site water is not the same as water used in electricity generation; and a building parcel is not the same as land for associated energy infrastructure.

For a fair comparison, use the same geography, year, workload and accounting boundary. The cited sources do not provide one harmonized international dataset covering all these measures, so seemingly similar headline figures may not be directly comparable.