Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

iTechGuides is reader-supported. When you buy through links on our site, we may earn an affiliate commission. As an Amazon Associate I earn from qualifying purchases. Learn more

TSMC is reportedly exploring a role helping operate Terafab, the chip project associated with Tesla, SpaceX and xAI. The October 3, 2026 report says talks with Intel over a Terafab role have stalled, but it does not establish that Intel has withdrawn or that TSMC has signed an agreement. The claims are attributed reporting, not an announced deal.

What the TSMC report says—and what it does not

Startup Fortune reported on October 3, 2026, citing Tim Culpan’s October 2 Culpium newsletter, that TSMC was exploring a partnership to help operate Terafab. The report says TSMC could see the project as an anchor client for a prospective Texas campus. It does not provide signed contract terms, a confirmed operating role, or a definitive schedule. Startup Fortune’s report

The same report describes discussions over Intel’s potential Terafab role as stalled. That is not evidence that Intel has exited the project: the report does not establish a withdrawal, and no confirmed competing proposals with terms for price, process node, capacity or schedule are presented.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What SpaceX had disclosed about Terafab

In correspondence to the SEC dated May 7, 2026, SpaceX said Tesla and SpaceX had agreed to a general framework for future Terafab development. It said particular projects would require separate negotiations and agreements covering matters such as timelines, milestones and capital expenditures. The filing also said Tesla and Intel were not obligated to remain part of the project. It does not document TSMC’s participation. SpaceX correspondence to the SEC

TSMC’s public position on Tesla and Intel

Before the October report, TSMC CEO C.C. Wei said on the company’s April 16, 2026 Q1 earnings call that Tesla and Intel were both TSMC customers and competitors. He described foundry success as depending on technology leadership, manufacturing excellence, customer trust and service. Those remarks provide context for the reported possibility of TSMC working with a project associated with Tesla; they were not a response to the later report. TSMC Q1 2026 earnings-call transcript

During that call, an analyst asked how TSMC viewed a customer trying to make chips itself and whether TSMC could win business back. The questions were part of the earnings-call discussion, not evidence that TSMC had already evaluated or agreed to a Terafab role.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Why a fab partnership would take time

Wei said a new fab takes two to three years to build, followed by another one to two years to ramp. He was describing a general fab timeline, not giving a Terafab schedule or confirming construction plans for the reported Texas campus.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

“Again, let me say that it takes two to three years to build a new fab. No shortcuts. And it takes another one to two years to ramp it up.”

Rank #4
MW Metal Case NDR-120W-12/24/48V Economical Single Output Industrial DIN Rail AC-DC Power Supply (NDR-120-12)
  • Original and Genuine NDR-120W|(12V 10A).(24V 5A).(48V 2.5A) For Industrial automation control system,Semiconductor fabrication equipment,Electro-mechanical apparatus
  • The NDR-120 series relevant certificates for industrial control apparatus (UL508, TUV BS EN/EN62368-1, and etc.) is a very competitive power supply solution for industrial applications.
  • Input 90-264Vac, in line with German industrial standard thin economical power supply
  • The metal shell has good heat dissipation, stable operation in the environment of -20? to 70?, and the efficiency is as high as 89%
  • It is equipped with constant current mode for over-load protection, fitting various inductive or capacitive applications.
Rank #3
Sale
DYSGLOBAL TDR-240-24 240W 24V 10A AC-DC Industrial Power Supply with PFC, UL EAC BIS CE EMC TUV UK Certified, for Automation Control Systems & Semiconductor Equipment
  • Wide Input Voltage Range: Supports 340-550VAC or 480-780VDC input, enabling stable operation in diverse industrial environments with flexible power source compatibility.
  • High Efficiency Performance: Achieves up to 92% efficiency with passive PFC, reducing energy loss and heat generation for reliable long-term operation in automation applications.
  • Comprehensive Protection Features: Integrated short-circuit, overload, over-voltage, and over-temperature safeguards ensure device safety and durability under demanding conditions.
  • Compact Rail Mount Design: Slim 63mm width with TS-35/7.5 or 15 rail mounting, optimizing space utilization in control cabinets while facilitating easy installation and maintenance.
  • Industrial Compliance & Certification: Meets UL61010, BS EN/EN61000-3-2, and EMC standards, guaranteeing suitability for industrial controls, manufacturing equipment, and electromechanical systems.
C.C. Wei, TSMC Chairman and CEO, April 16, 2026

How to read the developments

  • Established in an official disclosure: SpaceX said Tesla and SpaceX had a general framework for future Terafab development, with project details subject to separate agreements.
  • On the record before the report: TSMC said Tesla and Intel were both customers and competitors.
  • Reported, not confirmed as a deal: TSMC was exploring an operating partnership and Intel discussions had stalled.
  • Not established: a signed TSMC agreement, Intel’s withdrawal, or Terafab-specific terms, capacity, spending or timing.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.