Seiki Advanced Planning and Scheduling
Seiki Advanced Planning and Scheduling: A focused scheduler for manufacturers that need capacity-aware planning connected to ERP or MRP. Ranked #16 of 30 in Manufacturing Scheduling Software by our editors (7.9/10); pricing: Pricing on request; best for traditional ERP-connected production scheduling.
At a glance
- Editor score7.9 / 10
- PricingPricing on request
- Best forTraditional ERP-connected production scheduling
- Scheduling modeFinite_capacity
- Founded1992 · Brighton, United Kingdom
- Facts checked20 Sep 2026

Where it wins
- Finite-capacity planning covers resource, labor and material constraints.
- Graphical drag-and-drop planning supports visual schedule changes.
- What-if scenarios and dynamic capacity adjustments support disruption planning.
Where it doesn't
- Pricing requires contacting Seiki's team or booking a demo.
- No free plan is presented for self-serve evaluation.
- The product is focused on manufacturing operations rather than broader planning needs.
Our verdict on Seiki Advanced Planning and Scheduling
Seiki Advanced Planning and Scheduling, also called Seiki Scheduler, is production planning software for manufacturers managing work orders, delivery requirements, resource capacity and operational constraints. It supports finite-capacity scheduling across machines, labor and materials, with a graphical planning board for drag-and-drop schedule changes. Manufacturers can also manage works orders and production orders directly, while assembly management, operation splitting and overlapping operations address more detailed production flows. The software can operate as a standalone scheduler or connect with existing operational systems.
Pricing follows a contact-sales model. Seiki directs prospects to contact its team or book a demo rather than presenting public plan tiers. The product is designed to fit established manufacturing environments, with ERP and MRP integration through EAI. Additional connection options include SQL databases, Microsoft Access and CSV files. That combination suits organizations that need scheduling to work alongside existing production and business systems instead of replacing them. Buyers should clarify implementation scope, integration requirements and commercial terms with Seiki before selecting it.
The main strength is the depth of its manufacturing scheduling focus: automated rules, resource workload analysis, capacity modelling and what-if scenarios bring planning decisions into one workflow. Dynamic capacity adjustments can account for events such as breakdowns or absence, while graphical views support day-to-day schedule management. This is a strong match for manufacturers seeking a capacity-aware scheduler with traditional ERP or MRP connections. Organizations wanting a broader planning product or a public, self-serve purchase path should consider alternatives with that emphasis instead.
Your product? Our editors can test Seiki Advanced Planning and Scheduling in depth and publish a review, labelled as paid · from $149/mo →
Seiki Advanced Planning and Scheduling pricing
Seiki Advanced Planning and Scheduling fact sheet
| Free plan | Not verified |
|---|---|
| Paid from | Not verified |
| Scheduling mode | Finite_capacity |
| Machine capacity planning | Yes |
| Labor capacity planning | Yes |
| Material constraints | Yes |
| Multi-site scheduling | Not verified |
| Scenario planning | Yes |
| Support | Email, Phone |
| Built for | Small business, Mid-market, Enterprise (editorial estimate) |
| Integrations | 5 integrations: ERP systems, MRP systems, SQL databases, Microsoft Access, CSV files |
| Pricing | Pricing on request |
| Website | seikisystems.co.uk |
| Facts checked | 20 Sep 2026 |
Seiki Advanced Planning and Scheduling integrations
Seiki Advanced Planning and Scheduling lists 5 integrations on its own site.
- ERP systems
- MRP systems
- SQL databases
- Microsoft Access
- CSV files
Alternatives to Seiki Advanced Planning and Scheduling
- PlanetTogether APSA strong fit for complex, multi-site scheduling with capacity and constraint planning.9.4
- MangoGem APS OptimizerA deep scheduling system for manufacturers balancing complex, multi-site constraints.9.3
- SyncManufacturingA real-time scheduling system for manufacturers balancing machines, labor, materials, and priorities.9.2
See all Seiki Advanced Planning and Scheduling alternatives →
Used Seiki Advanced Planning and Scheduling? Be the first to review it
The editor score above is our own research. What this page doesn't have yet is a reader's view — what you used Seiki Advanced Planning and Scheduling for, what worked and what didn't. No stars are seeded and no review is paid for; an editor reads every one before it appears.
Write a reviewTwo minutes · verified accounts only · read by an editor before it appears
Featured on iTechGuides
Seiki Advanced Planning and Scheduling is listed in our Manufacturing Scheduling Software directory. Add the badge to your site — it links back to this page.
<a href="https://www.itechguides.com/products/seiki-advanced-planning-and-scheduling/"><img src="https://www.itechguides.com/best/badge/seiki-advanced-planning-and-scheduling.svg" alt="Featured on iTechGuides" width="230" height="46"></a>
Reviewed by iTechGuides Editors · Editorial team · Updated Oct 2026
Advertiser disclosure: iTechGuides is reader-supported. Vendors can pay for top positions in our rankings and for a place on other products' pages, and we may earn a commission when you click some links. Bought places stand at the number bought; this page and our disclosure say so. Paying vendors may get a fuller, more detailed review from our editors, and that review can change their score. How we rank.
Last updated · How we research and update



