iTechGuides is reader-supported. When you buy through links on our site, we may earn an affiliate commission. As an Amazon Associate I earn from qualifying purchases. Learn more
The safest way to cut data-center power is to measure the entire system, remove avoidable IT load, and then tune cooling and electrical infrastructure around the work that remains. Preserve application latency, throughput, availability, thermal limits, recovery capacity and resilience as hard constraints. A lower electricity bill or PUE is not a success if the facility delivers less computing or becomes less reliable.
Use a staged program: establish an IT-and-facility baseline, eliminate idle capacity, improve performance per watt, correct airflow and controls, evaluate economizing and heat reuse, and verify each change against workload output. The right mix depends on workload, climate, equipment density, water availability, facility design and uptime requirements.
Start with a measurement boundary that includes IT and facilities
Before buying servers, changing setpoints or installing containment, define what you are measuring. Record total facility energy and the energy delivered to IT equipment over the same interval. Include cooling, pumps, fans, power distribution losses, lighting and other overhead in the facility total. At the IT boundary, capture server, storage and network input power where the instrumentation permits.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Use PUE as an overhead indicator, not a performance score
Power Usage Effectiveness (PUE) is:
PUE = total facility energy ÷ IT equipment energy
A lower PUE means less facility overhead for each unit of IT energy. It does not show how much useful computing the equipment delivered, whether applications met their service-level objectives, or whether capacity was stranded. Pair PUE with IT utilization, workload throughput, latency, availability and energy trends. A facility can improve PUE while delivering fewer transactions, and it can increase PUE temporarily while adding productive capacity.
#1 Best Overall
- Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
- Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
- Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
- Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
- 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.
Build a repeatable baseline
Choose a reporting interval that exposes both normal operation and peaks—such as 15-minute or hourly data—and document the conditions for every comparison. Record:
- Facility and IT energy, separated by building, room or data hall where possible.
- Server input power, processor and memory utilization, storage and network load.
- Rack inlet temperatures, humidity and alarms.
- Cooling-plant operating state, fan and pump speeds, supply temperatures and compressor or chiller status.
- Workload throughput, latency, queue depth, error rate and availability.
- Water consumption and discharge temperatures when water-cooled equipment or heat rejection is involved.
- Weather and operating mode for facilities that use outside-air or water-side economizing.
Lawrence Berkeley National Laboratory’s Center of Expertise for Data Center Energy identifies DC Pro and its PUE Estimator as early-stage profiling tools. Use such tools to locate the largest energy categories and form an actionable plan; validate their outputs with calibrated meters and operating records before committing capital.
Reduce avoidable IT demand before changing infrastructure
IT equipment is the load that performs the business or scientific work, so reducing unnecessary IT demand usually has a larger and more durable effect than optimizing a small auxiliary component. Start with an inventory that connects each physical or virtual system to an application owner, service tier and recovery requirement.
Quick wins for a faster PC:
Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →Scan for outdated or missing drivers - takes under a minuteDriver Scan →Find idle, duplicated and stranded capacity
- Identify servers with sustained low processor, memory, disk or network utilization.
- Find systems retained after an application migration, test cycle or project termination.
- Detect duplicate services, obsolete development environments and abandoned virtual machines.
- Mark capacity reserved for failover, maintenance windows and peak demand so it is not mistaken for waste.
- Check licensing, data-residency, security and latency constraints before moving workloads.
Do not power down a low-utilization system until its owner confirms that it is not required for availability, disaster recovery, patching, forensic retention or an expected peak. Document the decision and a restoration procedure.
Consolidate compatible workloads
Consolidate applications onto fewer hosts when their operating systems, security boundaries, latency needs and failure domains are compatible. Virtualization and container scheduling can raise utilization, but the target is useful headroom, not maximum CPU occupancy. Leave enough margin for failover, burst traffic, memory pressure and maintenance. Validate throughput, tail latency, queueing and error rates at the new density.
Workload scheduling can also shift flexible jobs into periods when renewable power, cooler ambient conditions or existing capacity is available. Treat scheduling as an application change: define deadlines, data-movement limits and a rollback path, then compare energy per completed job rather than energy alone.
Rank #2
- 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
- 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
- Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
- 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
- What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.
Choose server improvements by performance per watt
A newer server is not automatically a lower-energy server for your workload. Evaluate the complete life-cycle outcome: useful work delivered, idle and peak power, capacity purchased, software licensing, reliability, support and disposal.
PC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchMeasure the real workload
For each candidate platform, capture performance per watt under representative load. A useful test includes normal traffic, peak or batch behavior, storage and network activity, and the redundancy mode used in production. Record:
- Completed transactions, jobs or requests per second.
- Median and tail latency, not just average response time.
- Input power at idle, typical load and peak load.
- Processor, memory, accelerator, storage and network utilization.
- Inlet temperature and fan behavior during the run.
Use these results to estimate energy for the actual service delivered. A replacement that halves server power but requires twice as many hosts, creates excess licensed capacity or lowers utilization may not reduce facility energy.
Use power-management features deliberately
Enable processor and platform power-management features that meet the application’s latency and throughput requirements. Test frequency scaling, idle states and power caps with production-like traffic. Some latency-sensitive or high-performance-computing jobs may lose more performance than the saved energy justifies; others have enough slack to benefit substantially. Keep a documented profile for each service tier rather than applying one setting to every host.
Consider qualified efficient equipment, but verify current status
The U.S. Department of Energy’s guidance on purchasing energy-efficient enterprise servers notes that newer ENERGY STAR qualified servers can provide better performance per watt than older equipment. Qualification lists and specifications change, so verify the current model, configuration and workload fit at purchase time. Compare the full configuration, including memory, drives, accelerators and power supplies, rather than a bare chassis figure.
Fix airflow before raising cooling setpoints
Cooling energy often rises because supply air mixes with exhaust air or bypasses the racks. Correct the air path first; otherwise a higher setpoint can simply move hot spots to equipment inlets.
Rank #3
- Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
- Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
- Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
- Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
- What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
Map supply, exhaust and bypass paths
- Measure temperatures at rack inlets and identify the hottest and coldest positions.
- Look for open rack spaces, gaps between cabinets, cable openings and unsealed floor or ceiling penetrations that allow supply air to bypass the load.
- Trace exhaust air recirculation into neighboring inlets, especially at row ends, above racks and around return-air paths.
- Compare airflow delivered by computer-room air handlers or air handlers with the airflow the racks actually require.
Use a smoke test, anemometer survey or computational model appropriate to the facility. The objective is a stable, predictable inlet condition—not simply a lower room-average temperature.
Organize racks and contain the right air
Arrange cabinets so equipment intakes face supply air and exhausts face the return path, commonly as alternating cold and hot aisles. Install rack blanking panels to close unused openings where the rack and containment design support them. Seal cable penetrations and floor openings that create bypass flow. Containment can be useful at higher densities, but it must be compatible with fire protection, maintenance access, return-air design and the building’s pressure relationships.
Raise temperatures only within equipment limits
DOE’s 2024 Best Practices Guide for Energy-Efficient Data Center Design recommends maximizing compute inlet temperature only while meeting the applicable IT thermal guidelines. Review every server, storage system, network device and accelerator in the affected zone; the least-tolerant device sets the safe envelope. Increase setpoints gradually, verify inlet temperatures and alarms, and stop if reliability, humidity control or fan energy worsens.
Do these 3 things before closing this tab:
1Clear out junk files and repair common Windows errors2Fix the driver behind crashes, sound loss and screen glitches3Repair Windows errors before they cause bigger problemsOptimize fans, pumps and cooling controls
After airflow is corrected, tune the plant to the actual load. Variable-speed fans and pumps can consume substantially less power at reduced speed, but control instability or inadequate flow can create hot spots.
Match airflow to measured demand
- Replace fixed-speed operation with variable-speed control where the equipment and controls support it.
- Use rack inlet temperature, pressure or airflow feedback instead of a single remote room sensor.
- Set a minimum safe speed for redundancy and transient response, then tune proportional and integral control to avoid hunting.
- Stage air handlers and pumps so that lightly loaded periods do not run unnecessary units.
Review chilled-water and heat-rejection settings
Higher chilled-water temperatures can reduce compressor lift, while lower condenser-water temperatures may improve chiller efficiency when outdoor conditions allow. The best point depends on chiller curves, coil performance, humidity control, pump energy and equipment limits. Compare total cooling-plant power, not one component in isolation. Check that water treatment, approach temperatures, flow and redundancy remain within the design requirements.
Evaluate economizing with climate, air quality and reliability in view
Outside-air or water-side economizing can reduce compressor operation during suitable weather. Availability is site-specific: climate, humidity, particulate levels, smoke, corrosive contaminants, filtration, noise and controls determine how many hours are practical.
Rank #4
- Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
- Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
- Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
- Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
- Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
Air-side economizing checks
- Confirm that temperature and humidity remain inside every IT device’s allowable range.
- Assess filtration pressure drop and the risk of dust, smoke, salt or corrosive gases.
- Provide a controlled fallback to mechanical cooling for weather changes and contamination events.
- Test dampers, sensors and control sequences under normal, transition and emergency conditions.
Water-side and evaporative options
Water-side economizers and evaporative heat rejection can lower electricity use but may increase water consumption, treatment needs and drought exposure. DOE’s guidance on cooling-water efficiency advises evaluating energy and water together. Include makeup water, blowdown, treatment, pumping and the reliability of the water supply in the operating model.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Balance electricity, water, carbon and heat reuse
Facility boundaries matter. A cooling change that reduces electricity may increase water use; a warmer exhaust stream may create a heat-reuse opportunity; a control change may affect backup capacity or carbon emissions. Track multiple indicators rather than optimizing a single ratio.
- PUE: facility energy divided by IT energy, an indicator of infrastructure overhead.
- WUE: water use associated with data-center operation relative to IT energy, useful where water stress or treatment is material.
- ERE: energy reuse effectiveness, which accounts for useful heat exported from the facility.
- CUE: carbon usage effectiveness, which reflects the emissions intensity of the energy supply.
Use the metric that matches the decision, and disclose the boundary and time period. A reported metric without its boundary can make two facilities appear comparable when they are not.
Compare improvement options by the problem they solve
| Option | Best suited to | Evaluate before implementation |
|---|---|---|
| Server consolidation or virtualization | Low utilization, duplicate systems and excess host count | Workload compatibility, utilization headroom, latency, availability, power draw, licensing, security and recovery capacity |
| Server replacement | Inefficient or aging equipment | Performance per watt for the real workload, power-management behavior, capacity need, reliability, purchase cost and operating cost |
| Airflow management and containment | Supply/exhaust mixing, bypass air and uneven rack temperatures | Rack layout, density, containment design, inlet conditions, controls, fire protection and maintainability |
| Economizing or cooling-system changes | Compressor, chiller or heat-rejection energy | Climate, available hours, air quality, humidity, water use, controls, fallback operation and reliability |
| Energy assessment and profiling | Unknown energy breakdown or uncertain retrofit priorities | Measurement boundaries, data quality, tool scope and whether the result leads to an actionable project |
Use a staged implementation plan
Stage 1: establish ownership and baseline
- Assign an owner for facility energy, IT utilization, application performance and reliability data.
- Synchronize meters, monitoring systems and workload logs.
- Document the current PUE, IT utilization, workload output, inlet temperatures, water use and operating conditions.
- Set success thresholds for latency, throughput, availability, thermal alarms and recovery capacity.
Stage 2: remove no-regret waste
- Retire or reassign confirmed-unused equipment.
- Close empty rack openings, seal bypass paths and correct obvious hot-air recirculation.
- Consolidate compatible low-utilization workloads while preserving failure-domain separation.
- Correct sensors, alarms and inventory records that would otherwise hide problems.
Stage 3: run controlled pilots
- Select one rack, row or service tier with representative load and clear rollback criteria.
- Change one major variable at a time—such as a power profile, fan sequence or temperature setpoint.
- Observe normal and peak periods long enough to capture thermal lag, scheduled jobs and weather changes.
- Compare facility energy, IT energy, useful workload, service quality and water effects with the baseline.
Stage 4: scale with change control
Roll out only after the pilot meets its technical and reliability thresholds. Update operating procedures, diagrams, alarm limits and maintenance schedules. Keep the former configuration available until the new state has passed a defined observation period.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Protect performance and resilience during every change
Power reduction is a constrained optimization problem. Treat the following as release gates:
Recommended Free Tools
- Application latency and throughput remain within the service-level objective, including tail behavior.
- Peak and failover tests retain required capacity.
- Rack inlet temperatures, humidity and equipment alarms remain within manufacturer limits.
- Redundant cooling, power and network paths remain independently serviceable.
- Backup runtime, generator loading and transfer behavior are unchanged or revalidated.
- Security, licensing, data-residency and maintenance requirements still hold after consolidation or scheduling.
Trend these indicators after implementation. A project that looks successful during a quiet week may fail when batch processing, seasonal weather or a component outage changes the operating point.
Best Value
- 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
- Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
- Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
- HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
- What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
Interpret reported savings carefully
The Better Buildings Data Center Accelerator toolkit reports that 21 participating organizations reduced infrastructure energy intensity by 25% in one or more data centers. This is a reported partner-program result, not an average, guarantee or forecast for another facility. Differences in baseline, measurement boundary, climate, workload and project scope can produce very different outcomes.
Likewise, DOE/FEMP’s July 2024 design guide states: No design guide can offer ‘the most energy-efficient’ data center design, but these guidelines can provide efficiency benefits for a wide variety of data center scenarios.
Use that principle when comparing proposals: ask what was measured, under which conditions, and whether useful computing and reliability were preserved.
Troubleshoot common failed approaches
PUE improves but the service slows
Check whether consolidation or power capping reduced useful output, increased queueing or forced work onto less efficient hosts. Restore the previous profile, then retest with a workload-level metric such as completed jobs per kilowatt-hour.
Setpoint changes create hot spots
Inspect rack-level inlet temperatures, bypass openings, containment leaks and sensor placement. Return to the last safe setpoint, correct airflow distribution and raise temperatures only in small, verified increments.
Virtualization saves servers but not energy
Review host utilization, memory pressure, storage activity and power state. If hosts remain lightly loaded or consolidation increased cooling demand, adjust placement and power policies or retire the excess capacity rather than assuming virtualization alone will deliver savings.
Economizing triggers alarms or contamination concerns
Check humidity, particulate filtration, damper sequencing and sensor calibration. Use mechanical cooling while investigating, and define environmental lockouts and a documented fallback before re-enabling economizer operation.
Water use rises after an electricity project
Recalculate WUE and include treatment, blowdown and pumping. Compare the combined energy, water, reliability and local-resource impact; a lower electrical figure may not be the preferred outcome in a water-constrained site.
Free tools Windows power users keep installed
One-click scans. No signup required.
Operator checklist
- Have facility and IT energy meters been aligned to the same time interval?
- Are PUE, utilization and workload-output metrics reported together?
- Does every low-utilization system have an owner and a documented recovery role?
- Were consolidation and power-management changes tested at peak and failover conditions?
- Are rack inlet temperatures measured at the equipment, not inferred from a room average?
- Have bypass air, recirculation, blanking panels and containment compatibility been checked?
- Are fan, pump and chiller controls responding to actual load without hunting?
- Were climate, humidity, air quality, water supply and fallback cooling assessed before economizing?
- Do the project records include energy, useful work, reliability and water effects?
- Is there a rollback plan and an observation period after each change?
A practical decision rule
Choose the measure that removes the largest verified source of wasted energy while keeping the workload, thermal and resilience limits intact. In many facilities that means eliminating unused capacity and fixing airflow before replacing equipment or redesigning cooling. Re-measure after every material change, and judge success by useful computing delivered with acceptable energy, water and reliability—not by a single headline percentage.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.