To read a construction company’s backlog, first find the issuer’s own definition and the contract status it requires. Then separate signed or otherwise committed work from awarded work, development assets and prospective bids. Finally, test how much of the balance is expected to convert to revenue, how quickly, and with what execution, margin and cash-flow risks.

Backlog is not a universal accounting measure. It is not automatically revenue, profit, cash or a guarantee that every listed project will be built. A useful analysis follows the balance’s definition, commitment level, timing, movement and risk disclosures rather than relying on the headline number.

What backlog and pipeline mean

Backlog is the value of work a company says remains to be performed under contracts or other commitments that meet its stated inclusion rules. Those rules differ by issuer. One contractor may count only executed contracts; another may include a formal notice to proceed, a limited authorization or another assurance that management considers firm.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Project pipeline is a broader opportunity set. It can include bids, prospects, development rights, letters of intent, options and projects that still need a definitive contract or funding. Pipeline items may never become backlog. Treat the pipeline as potential future awards, not as work that is already secured.

#1 Best Overall
Sale
Compressed Air Duster,130000RPM Super Power Cordless Air Duster,Rechargeable Brushless Blower,3 Gear Adjustable Blower with LED Light,Dust Remover for Computer/House/Outdoor/Car
  • Powerful Turbo Fan:CAGIWIRU Electric Air Duster have reached speed up to 130000RPM,Can efficient remove dust and debris.With LED light and Three Adjustable Speed to meet with different cleaning tasks.
  • With Attached USB C Fasting Charging cable.Charing 3 hours,Enjoy up to 240 minutes of use on the lowest setting, For third speed can use for 25mins.with four charging options to meet with your needs.
  • Wide Application: attached 5 different nozzles,making it suitable for a variety of scenes, such as car,pet, pc, keyboards, and other electronic devices. It also serves for office and home clean duster.
  • Handy Design & Portable:Cordless air duster electric nozzle is Light weight and small size, design and comfortable to hold and space saving, convenient to carry around. You can put it in your room or inside the car without taking up space.
  • Economical &Reusable: Built durable materials with a long-lasting battery,our CAGIWIRU air duster it's a sustainable alternative to disposable air cans.

The terms can also overlap with accounting concepts such as remaining performance obligations (RPO) or transaction price allocated to unsatisfied obligations. Those measures may be comparable in purpose but are not necessarily identical to a company’s non-GAAP backlog. Always use the reporting company’s labels and reconciliation.

Start with the issuer’s exact backlog definition

Read the latest annual report, quarterly filing or results release before comparing two contractors. Search for “backlog,” “remaining performance obligations,” “awarded backlog,” “contract backlog” and “pipeline,” then copy the definition and the date of the balance you are analyzing.

Issuer How the cited disclosure describes the measure Why the distinction matters
North American Construction Group Backlog is secured outstanding work with high certainty, supported by a signed contract or work order specifying expected scope, value and timing. The company says it is not a GAAP term and is similar in nature to transaction price allocated to remaining performance obligations, while noting that the figures can differ. A non-GAAP balance can be useful, but its boundary is set by the issuer and may not match another contractor’s number.
MDA Ltd. Contract backlog is awarded contract value less work completed. MDA says the measure equates to unsatisfied or partially satisfied remaining performance obligations under IFRS. “Awarded” and an accounting RPO measure may be close for this issuer, but that does not make every company’s awarded backlog equivalent.
Primoris Services Corporation The company explains that infrastructure providers use varying definitions and distinguishes signed backlog from awarded backlog. A headline total can combine different commitment stages unless you identify which category is being reported.
Sterling Infrastructure Backlog includes unearned revenue plus contracts awarded but not started. Not-yet-started awards are included once a contract is fully executed and/or a formal notice to proceed has been received. The inclusion test tells you how much of the balance is legally documented and ready to begin.
Matrix Service Company Backlog may include work awarded through signed contracts, a limited notice to proceed or another assurance management considers firm. A limited authorization can create a different level of certainty from a fully executed engineering, procurement and construction contract.

Do not impose a universal hierarchy on these examples. The same phrase, such as “awarded,” can have different legal and funding implications in different filings.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Separate signed work, awarded work and pipeline opportunities

Build a commitment map for every project category the company discloses. The following labels are analytical stages, not accounting rules:

Rank #2
EVEO® Screen Cleaner Spray Kit (Streak-Free) TV Screen Cleaner for Smart TV, Lcd, LEd, Oled | Computer Screen Cleaner Spray and Wipe Microfiber Cloth - TV, Monitor, Laptop, iPad, Car - 6.7oz 1 Pack
  • Screen Cleaner is Your Screen’s New Bestfriend! - EVEO is proud to present a screen cleaner that’s perfectly suited for your TV. Meet your new screen cleaner, computer screen cleaner, laptop cleaner, iPad cleaner, Macbook,tv cleaner or any other electronic device. Our screen cleaner spray and wipe along with the included plush microfiber cloth, easily removes dust, fingerprints & other smudges on the screen’s surface. Clean effectively for a streak-free screen
  • Gentle on your Screens - Our screen cleaner spray and wipes is compatible to be used even for the most sensitive LCD, LED, CRT, and OLED screens in proper use. Be at ease knowing that this product is compatible with all the major brands: LG, SONY, Samsung, Sharp, iPad, iPhone, Android screens, Kindle, PC monitors - we’ve got you covered! Can be used as LCD screen cleaner, tv cleaner, smart tv screen cleaner, and more
  • Premium Super Soft Plush Microfiber Cloth - Included in this efficient screen cleaning kit. This screen cleaner spray and wipe has our signature plush microfiber cloth specially designed to comply with screens and monitors and leave them streak-free. Has been shown to effectively absorbs stubborn stains, zero streaks, and no fiber shedding. Always use this together with our screen cleaner for the best results
  • Easy-to-Use Screen Cleaner Kit + microfiber cleaning cloth - The EVEO Screen Cleaning Kit will easily be your new favorite tool when it comes to taking care of the things you love most, quick and easy solution for a streak-free screen. Simply screw on the sprayer gun on the screen cleaner bottle. Spray the cleaning liquid onto the microfiber cloth, then wipe the screen until desired cleanliness & shine is achieved.
  • Quality Screen Care Kit Worth Purchasing - Enjoy a convenient Screen Cleaner anytime, anywhere you need it. Your satisfaction is our top priority. We stand behind the quality of our products and that’s why, you shouldn’t be worrying at all. We manufacture the Best Screen Cleaner. and can be used for laptop cleaning kit, laptop screen cleaner, tv screen cleaner for smart tv. MacBook screen cleaner, monitor cleaner or screen cleaner spray for electronic devices with microfiber cleaning cloth
  • Executed contract: Both parties have signed an agreement that defines scope, price or pricing method, and performance obligations.
  • Notice to proceed: The customer has authorized some or all work. Check whether it is formal, limited, conditional or revocable.
  • Awarded but not executed: The customer has selected the contractor, but a definitive contract may still be under negotiation.
  • Letter of intent, option or master-service arrangement: The relationship may support future work, yet volume, price and timing may remain uncertain.
  • Development asset or prospective bid: The project is an opportunity rather than a customer commitment.

Primoris uses separate signed and awarded backlog categories, illustrating why the stage must be identified rather than folded into one total. Sterling’s policy requires a fully executed contract and/or formal notice to proceed for not-yet-started awards. Matrix describes signed contracts, limited notices to proceed and other assurances management views as firm. These are issuer-specific criteria, not a sector-wide standard.

Ameresco provides a useful pipeline example: it describes assets in development separately from fully contracted backlog, with contract execution marking the move to fully contracted backlog for the projects described in its June 30, 2026 Form 10-Q. If a company presents development rights, “near-term opportunities” or a bid pipeline beside backlog, do not add them together without an explicit reconciliation.

Find out when backlog is expected to become revenue

A backlog balance becomes more informative when the issuer supplies a conversion schedule. Look for the amount expected within the next 12 months, the remaining duration of projects, segment-level timing and any distinction between work already in progress and work that has not started. Recognition is rarely even across the entire balance.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Issuer and reporting date Published figure How to use it
MDA Ltd., June 30, 2026 $9.2 billion of contract backlog and approximately 13 months of work; backlog was up $1.4 billion from June 30, 2025. This is a company-specific duration and year-over-year change, not a construction-sector benchmark. The figure does not mean exactly one-thirteenth of backlog will convert each month.
Quanta Services, June 30, 2026 $33.55 billion of remaining performance obligations, with approximately 70% expected to be recognized in the following 12 months. The 70% is an issuer estimate and RPO may not equal another company’s backlog. Timing can change as projects and contracts change.
Tutor Perini, 2025 annual report example Approximately $6 billion, or approximately 29% of backlog, expected to be recognized in 2026. This illustrates an annual conversion disclosure for one company and period; it is not a general rule for contractors.

When no 12-month split is given, record that limitation explicitly. A large balance with no timing detail cannot by itself answer how much revenue is likely next year. Compare the schedule with project duration, segment mix and the company’s revenue-recognition policy.

Rank #3
Sale
BladeHawks RGB Gaming Mouse Pad Extra Large Extended 31.5x12 Inch-Black | LED mouse pad with 14 lighting modes, covers keyboard & mouse, anti-slip rubber base, waterproof surface, USB powered
  • 【Large size】:Measuring 800 x 300 mm/ 31. 5×12 inches, which is wider and taller than others. Large mouse pad can perfectly fit your keyboard and mouse of any size, and there is also ample space for peripherals such as phones, tablets, etc.
  • 【LED backlight mouse pad】:Blade Hawks RGB mouse pad provides 7 static modes and 7 dynamic modes will give you the options you are looking for. Power-off memory function remembers the last lighting mode you selected. The super glow fiber Chroma will give you a colorful gaming setup that you want.
  • 【Anti-slip rubber base】:Made from Natural rubber, this gaming mousepad will firmly grip your desktop, allowing you to enjoy the ultimate precision in the games you are most passionate about. It also comes with a texture that enhances this ability even further.
  • 【Smooth and waterproof surface】: Micro-textured cloth surface, for extremely precise mouse control and a smooth movement. When liquid splashes on the gaming mouse pad, it forms water droplets and slides down. Will not delay your work or gameplay.
  • 【Plug and play】: This mouse and keyboard pad is powered by USB, plug and play, no driver required. One button control light modes. Press one time to change the lighting mode, press twice to change the brightness, press and hold about 3 seconds turn ON/OFF.

Read the backlog rollforward, not just the ending balance

A rollforward explains why backlog changed. The most useful format shows beginning backlog, new contracts and change orders or other adjustments, revenue recognized, and ending backlog.

Sterling’s 2025 annual report provides a concrete example. Its backlog was $2.573 billion at December 31, 2024. New contracts, change orders and adjustments added $230.336 million during 2025, while revenue recognized reduced backlog by $772.168 million, leaving $2.031 billion at December 31, 2025. The filing reports the amounts in thousands.

Rollforward item Sterling 2025 example Analytical question
Beginning backlog $2.573 billion at December 31, 2024 What work was carried into the year, and how much was already in progress?
New contracts, change orders and adjustments +$230.336 million during 2025 Did growth come from new awards, pricing changes, scope changes, claims or another adjustment?
Revenue recognized −$772.168 million during 2025 How quickly is the company consuming the opening balance?
Ending backlog $2.031 billion at December 31, 2025 Is the closing balance being replenished faster or slower than work is completed?

A falling balance can coexist with strong execution if revenue recognized exceeds new awards. A rising balance can reflect genuine demand, acquisitions, large change orders or revisions rather than an equivalent increase in organic future revenue. Read the footnotes for acquisition effects and the company’s explanation of adjustments.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Test whether backlog is funded and cancellable

Contract status alone does not establish economic certainty. For each major category, check the customer’s funding, termination rights and conditions that must be satisfied before full work begins.

Rank #4
Sale
Vaydeer Wrist Rest for Keyboard and Mouse, Computer Ergonomic Wrist Support Pad, Soft Memory Foam Arm Cushion for Desk, Palm Hand Office Laptop Typing
  • 【Softer and More Comfortable】Vaydeer wrist rest has unique diamond pattern, which is the combination of softness and aesthetics. The materials of wrist rest are improved into higher quality memory foam and covered with silky smooth lycra. The computer wrist rest makes you as comfortable and cushiony as like rest your wrists on clouds.
  • 【Ergonomic Wrist Saver】The wrist rests for keyboard and mouse comes with a 17.32×3.15×0.83 inch keyboard wrist pad and a 5.94×3.15×0.83 inch mouse wrist support. Based on ergonomic design, the unique concave shape is the perfect fit for your wrist joints. The wrist rest pad fits most computer keyboards and laptops, improve hand and wrist posture, release your wrist and arm stress.
  • 【Non-Slip Rubber Bottom】Featuring an anti-skid silicone base on the bottom, this wrist keyboard support stays firmly in place on your desk, preventing the padding from sliding around, ensuring stable and consistent wrist support during extended computer sessions.
  • 【Better Experience & Pain Relief】Our keyboard arm rest is beneficial to alleviate the soreness caused by direct contact and friction between your arm and a hard desk surface, reducing the risk of wrist fatigue or carpal tunnel. The soft texture of memory foam can evenly distribute the pressure around your wrists and provide good support with just enough give.
  • 【Helpful in Multiple Scenarios】Whether you're working, studying, writing, typing, gaming, this keyboard and mouse rest combo is an essential accessory to add comfort and support to your hands and wrists. It’s also a great gift for men, women, family, friend, coworker, gamer, teacher, etc.

Funding and authorization

Determine whether the customer has appropriated or otherwise secured funding. Public-sector work may be awarded before all annual funding is available. A limited notice to proceed may authorize only design or early procurement, leaving the larger construction value conditional.

Termination and cancellation terms

Read whether the customer can terminate for convenience, what costs are reimbursed and whether the contractor is entitled to lost profit. Primoris states that it typically lacks a contractual right to all revenue reflected in backlog if a project is canceled. That means a reported balance should not be treated as an unconditional claim for the full amount.

Permits, approvals and customer decisions

Identify dependencies on permits, land access, environmental approvals, financing, interconnection agreements, engineering completion or customer acceptance. A project can remain in a company’s opportunity set while one of these gates is unresolved.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Change orders and claims

Ask whether the backlog includes approved change orders, pending claims or estimated variable consideration. Separate signed scope from management estimates, and check how the company updates backlog when price or scope is disputed.

Best Value
Sale
Under Desk Cable Management Tray No Drill, Metal Mesh Cable Management Under Desk with Clamp Mount, 2 Hole Cable Tray with Wire Management and Cord Organizer for Home Office Standing Desk
  • 【No Drill Mounted】Cable management tray can be assembled in as little as 3 minutes or less-simply. Side clips easily clampe the edge of desk, pass through the holes on the sides, and secure excess cables with baskets. Desk cable management supports inward or outward installation to meet your needs in different scenarios, and provides you with great convenience when collecting and organizing wires.
  • 【Rubber Pad Protects Desk】Wire organizer under desk built-in soft rubber pads on the clamp protect your desk from scratches, so you will not damage your furniture or office.
  • 【Sturdy and Beautiful】Cord management under desk is made of high-quality carbon steel and holds about 15 lbs. The wire basket has 2 holes on each side of the tray to enable your cables to pass freely. Cable baskets are suitable for desk thickness use from 0.4" to 2.4".
  • 【Space Saving & Keep Organized】Desk cable management tray holds all your power cords, outlet strips, USB hubs and computer transformers hidden from your feet, and the data cables will not enter the vacuum cleaner to keep your desk clean and tidy. Desk wire organizer is also suitable for use in the kitchen and outdoors.
  • 【Reduce Safety Risks】Cable tray under desk keeps all plugs away from your kids, no more worry about tripping. Using 2 holes wire tray saves extra space, helps you easily cabling and wire protection. The mesh design is not easy to accumulate dust, but avoids safety accidents caused by messy wires.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Understand why timing estimates can move

Quanta cautions that estimated recognition timing can change because of acceleration, cancellations or delays, commercial issues, regulation, natural disasters, emergencies, adverse weather and customer acceptance of change orders. These factors can move revenue between periods without changing the headline project list.

Execution risk also depends on contract type and cost exposure. Fixed-price work can transfer cost-overrun risk to the contractor; cost-reimbursable work may provide different protection but can have less predictable customer spending. Review cost-to-complete estimates, labor and material availability, subcontractor exposure, liquidated damages, bonding requirements and claims when disclosed.

Backlog does not directly forecast gross margin or cash flow. To assess economics, connect the backlog discussion with segment margins, contract assets and liabilities, billing terms, retainage, working-capital needs and operating cash flow. If the filing does not disclose margin conversion by backlog cohort, do not infer a margin forecast from the total backlog.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Compare two construction companies on like-for-like axes

When comparing issuers, create a side-by-side worksheet instead of ranking the largest headline number.

Comparison axis Questions to answer
Definition and accounting basis Is the figure called backlog, contract backlog, awarded backlog or RPO? Is it GAAP/IFRS-based, non-GAAP or reconciled to an accounting measure?
Commitment stage What share is under executed contracts, formal notices to proceed, limited authorizations, awards, letters of intent, options or development rights?
Funding and cancellation protection Is customer funding secured? Can the customer terminate for convenience? What costs or profit are reimbursed?
Conversion schedule What percentage is expected within 12 months? How long are projects expected to last, and do segments convert at different rates?
Backlog movement How do new awards and adjustments compare with revenue recognized? Are acquisitions included?
Concentration and mix Is backlog concentrated in one customer, project, geography, end market, contract type or regulatory program?
Execution and economics What are the change-order, cost-to-complete, labor, materials, bonding, working-capital and cash-conversion risks?

Only after normalizing these points should you compare backlog-to-revenue ratios or implied years of work. A ratio based on signed contracts is not directly comparable with one that includes limited notices to proceed or development-stage awards.

A step-by-step method for reading a new filing

  1. Record the reporting date. Write down the date of the balance, not merely the filing publication date. Backlog can change materially between quarter-end and release.
  2. Copy the definition. Note the exact inclusion test, whether the measure is GAAP, IFRS or non-GAAP, and any reconciliation to RPO or transaction price.
  3. Classify commitment. Split executed contracts, formal notices to proceed, limited authorizations, awarded-but-unexecuted work and pipeline opportunities.
  4. Find the conversion schedule. Capture the next-12-month amount or percentage, expected project duration and segment timing. Mark “not stated” when the issuer provides no comparable value.
  5. Build the rollforward. Reconcile beginning backlog, new contracts, change orders, acquisitions or other adjustments, revenue recognized and ending backlog.
  6. Check funding and cancellation language. Read risk factors and contract footnotes for termination rights, reimbursement, appropriations, permits and customer approvals.
  7. Assess concentration. Identify dependence on major customers, projects, geographies, subcontractors or a single end market.
  8. Connect backlog to financial statements. Compare the movement with revenue, contract assets and liabilities, billings, receivables, operating cash flow and segment margins.
  9. Write a qualified conclusion. State what the backlog supports, what timing is estimated, and which portions remain conditional. Do not convert an issuer estimate into a guarantee.

What the headline number can and cannot tell you

Observation Reasonable interpretation What it does not prove
Backlog increased year over year New awards or adjustments exceeded work completed, or acquisitions added projects. It does not prove higher future profit, cash flow or organic demand.
Backlog declined Revenue recognition may have consumed more work than new awards replaced. It does not automatically indicate weakening execution or demand.
Most backlog is expected within 12 months The issuer anticipates substantial near-term revenue recognition. It does not guarantee completion, margin or cash collection in that period.
A large pipeline is disclosed Management sees potential future opportunities. It does not mean customers have signed contracts or committed funding.
A project is called awarded The customer has selected or authorized some level of work under the issuer’s definition. It does not establish that the full engineering, procurement and construction scope is executed.

Common mistakes and how to avoid them

  • Comparing totals without definitions: Read each issuer’s inclusion policy and separate signed, awarded and development-stage amounts.
  • Calling pipeline backlog: Keep unsigned bids, development assets and options outside contracted work unless the company explicitly includes them.
  • Dividing backlog by annual revenue and declaring a forecast: Use the issuer’s conversion schedule, project duration and segment mix; revenue is not recognized evenly.
  • Treating backlog as guaranteed sales: Review funding, termination, permitting, customer acceptance and change-order provisions.
  • Ignoring the rollforward: A balance can rise because of acquisitions or adjustments and fall because of successful execution.
  • Inferring profit or cash: Examine contract type, cost-to-complete, billings, working capital and margins; backlog alone contains none of those answers.
  • Using a dated figure as current: Label every balance with its reporting date and note subsequent awards, cancellations or delays disclosed later.
  • Assuming RPO equals backlog: Confirm the issuer’s accounting basis and reconciliation before combining the measures.

Bottom line for an investor or analyst

A construction company’s backlog is best read as a defined pool of future work, while its pipeline is a set of opportunities at earlier and less certain stages. The quality of the backlog depends on what the issuer counts, how much is funded and cancellable, when projects are expected to convert, and whether new awards are replacing completed work. Use the definition, commitment map, conversion schedule, rollforward and risk disclosures together; the ending dollar figure alone is not a forecast.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.