Asia-Pacific data-centre demand is expanding, driven by cloud adoption, AI workloads, digitalisation and hyperscaler commitments. But regional capacity figures measure different things, and the growing pipeline is not the same as operating supply. For investors and infrastructure professionals, the central question is not just how much capacity is announced: it is where power, land and regulatory conditions will allow projects to be delivered.

What is driving Asia-Pacific data-centre growth?

Cloud adoption, digitalisation and AI implementation are increasing demand for data-centre capacity. CBRE also identifies neocloud providers—companies supplying high-performance computing capacity—as an emerging source of demand. JLL points to rising hyperscaler commitments and a multiyear growth cycle in which supply has lagged demand, contributing to declining vacancy.

AI is changing the scale and infrastructure needs of new facilities. CBRE says new builds are averaging more than 100 MW and that intensive AI workloads are adding pressure to power infrastructure. Larger projects can serve substantial computing demand, but they also require more power and make grid access a critical part of development planning.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How much data-centre capacity is in the market?

There is no single harmonised Asia-Pacific capacity series in the reported figures below. The measures have different scopes and should not be added, averaged or treated as interchangeable.

#1 Best Overall
Tecmojo 12U Open Frame Network Rack for IT & AV Gear, AV Rack Floor Standing or Wall Mounted,with 2 PCS 1U Rack Shelves & Mounting Hardware,Network Rack for 19" Networking,Audio and Video Device
  • 【Powerful Load-bearing】12U Network Rack Open Frame is constructed from durable cold rolled steel; Rack shelf supports enhance stability, wall-mounted capacity of 130lbs, the ground-mounted up to 260lbs
  • 【Considerate Designs】Open-frame layout, including a top panel adding space, anti-slip shelf stops fixing devices and compatible racks for stack and expansion to meet requirements of home server rack
  • 【Complete Accessories】A 12U open frame server rack, two ventilated shelves, four shelf stops, four velcro straps and a set of equipment mounting screws
  • 【Versatile Application】Ideal for space-efficient multi-device setups in warehouses, retail, classrooms, offices and more; Excellent choices as AV Rack/IT Rack
  • 【Effortless Setup】 Network Rack includes hardware, a comprehensive manual, mounting hole drilling template and an online assembly video to simplify setup
Measure Reported figure What it counts Publisher and period
Total IT capacity 87.5 GW in 2025, up from 61.3 GW in 2024 (42.7% annual growth) Total IT capacity; not equivalent to operational capacity Mapletree Industrial Trust, citing DC Byte, 2026
Operational capacity added About 1,557 MW during 2025 Capacity added to operational stock during the year Asia Pacific Real Assets Association (APREA), 2026
Operational capacity and development pipeline 13.8 GW operational; 19.4 GW pipeline, comprising 3.7 GW under construction and 15.7 GW planned Operational stock and projects at distinct development stages Cushman & Wakefield figures distributed by APREA, March 2026
Forecast capacity additions 24 GW between 2025 and 2030 Forecast across colocation, hyperscale self-build and on-premises facilities; JLL describes this as a high-growth scenario JLL, 2026

The gap between the 87.5 GW total IT capacity figure and the 13.8 GW operational-capacity snapshot is substantial. The available figures do not reconcile the sources’ geography, facility categories or development-stage definitions, so neither should be presented as a definitive substitute for the other. Likewise, planned and forecast capacity should not be described as live capacity.

Where is development moving?

CBRE says expansion is shifting from traditional Tier I markets toward locations with better power access, naming Malaysia, Australia and India among key growth markets. Mapletree attributes 63.9% of its reported increase in 2025 total IT capacity to Australia, Malaysia and India. Its market overview also reports 4.1 GW of regional take-up in 2025; Australia, Malaysia and Thailand together accounted for 67.7% of that take-up. Mapletree says Thailand’s activity included preleasing in large colocation facilities and self-builds by social-media and cloud-service providers.

The selected primary-market snapshot below shows operational capacity, construction, plans and colocation vacancy side by side. It is not a complete country ranking, and planned projects are not guaranteed to be delivered.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #2
Tecmojo 12U Wall Mount Server Cabinet IT Network Rack Enclosure Lockable Door and Side Panels Black,Cooling Fan,Glass Door,17.7inch Depth,for 19” IT Equipment,A/V Devices
  • Save valuable floor space: 12U wall mount server cabinet Dimensions: 24.25" H x21.65" W x17.72" D. MAXIMUM MOUNTING DEPTH is 14.2".
  • Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access; Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
  • Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punchout panels for easy cable access
  • Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
  • PCI & HIPPA and EIA/ECA-310-E compliant
Market Operational capacity Under construction Planned Colocation vacancy
Greater Tokyo 1,179 MW 228 MW 1,705 MW 5.6%
Singapore 1,043 MW 20 MW 237 MW 4.9%
Sydney 786 MW 189 MW 1,102 MW 3.0%
Mumbai 768 MW 323 MW 998 MW 6.3%
Hong Kong 581 MW 161 MW 510 MW 19.1%
Johor 897 MW 315 MW 2,099 MW 0.7%
Greater Seoul 601 MW 223 MW 698 MW 6.9%
Greater Jakarta 322 MW 186 MW 901 MW 24.9%
Bangkok 113 MW 347 MW 702 MW 17.6%

These 2025 figures come from Cushman & Wakefield’s selected primary-market snapshot, distributed by APREA in March 2026. Its year-over-year comparison shows operating capacity rising in Johor from 401 MW to 897 MW and in Mumbai from 542 MW to 768 MW. The very different vacancy readings across markets also caution against describing regional conditions as uniformly tight.

Cushman & Wakefield’s H1 2026 update covers primary markets including Tokyo, Singapore, Sydney, Mumbai, Hong Kong, Johor, Seoul, Jakarta and Bangkok, as well as secondary markets such as Delhi, Taipei, Auckland, Manila, Ho Chi Minh City and Perth. It describes development shifting toward peripheral locations and emerging markets with better power access.

Why are power constraints affecting development?

Electricity demand from data centres is rising quickly. CBRE reports that regional data-centre electricity consumption nearly doubled between 2020 and 2024 and expects it to triple over the next few years. It identifies power availability as a major challenge as expansion outpaces available capacity. JLL reports grid-connection delays ranging from 24 months in emerging markets to more than eight years in core markets.

Rank #3
VEVOR 12U Open Frame Server Rack, 23-40 in Adjustable Depth, Free Standing or Wall Mount Network Server Rack, 4 Post AV Rack with Casters, Holds All Your Networking IT Equipment AV Gear Router Modem
  • Adjustable Depth: 23-40'' adjustable depth is used for servers and network equipment, ensuring enough space for AV equipment, components, and cabling, while allowing you to access ports and equipment from multiple sides.
  • Strong Load Capacity: Ground-Mounted Load Capacity: 500 lbs, Wall-Mounted Load Capacity: 150 lbs. The av rack is made of carbon steel for better weldability performance and can help save space while meeting your need to place multiple devices.
  • User-friendly Design: Ergonomic design makes the open frame av rack easier to use. The additional top panel is able to place other items with more available space. Roller design moves anywhere and anytime, is convenient, and is more energy-saving.
  • Complete Accessories: We provide the accessories you need, including 2 x Pallets, 145 x M5*10 Cross Head Screws, 4 x Casters, 4 x M10*50 Expansion Screws,10 x M6*12 Cage Nuts, 1 x Grounding Wire, 1 x User Manual.
  • Wide Application: The server rack wall mount maximizes the use of available space, suitable for retail venues, classrooms, offices, and other places where space is limited.

Those connection delays can determine whether a project can proceed on its intended schedule or whether a developer must consider a different site. Cushman & Wakefield says power availability, infrastructure readiness and regulatory certainty are increasingly decisive in location choices. The shift toward power-advantaged markets reflects that execution reality, not demand alone.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Other delivery and cost risks

  • Construction economics: CBRE cites elevated construction costs, competition around AI buildouts, rising land prices and advanced liquid-cooling systems as cost pressures.
  • Sustainability requirements: CBRE says building sustainability compliance adds to costs.
  • Delivery stage: A project that is planned, announced or forecast is not equivalent to one under construction or operating; assess each category separately.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What do investment and capital figures indicate?

CBRE reports US$11.6 billion of direct Asia-Pacific data-centre investment in 2025 and, separately, US$8.3 billion of entity-level transactions for the year. These are distinct transaction measures. CBRE says its investment coverage includes stabilised assets, development sites, conversions, platform transactions and operating-company transactions.

JLL associates its 24 GW 2025–2030 high-growth capacity scenario with US$286 billion in real-estate value creation and up to US$486 billion for GPU and networking fit-out. Its US$772 billion total capital-requirement figure is a scenario estimate, not committed funding or observed investment.

Rank #4
Tecmojo 6U Wall Mount Server Cabinet IT Network Rack Enclosure Lockable Door and Side Panels Black, Cooling Fan, Standard Glass Door, 450mm Depth, for 19” IT Equipment, A/V Devices
  • Save valuable floor space: 6U wall mount server cabinet Dimensions: 13.78" H x21.65" W x17.72" D.Maximum mounting depth is 14.2"
  • Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access. Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
  • Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punch-out panels for easy cable access
  • Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
  • PCI & HIPPA and EIA/ECA-310-E compliant

How should investors compare markets?

A useful comparison separates current operating conditions from the resources and commitments needed to build more capacity. Check these factors together rather than ranking markets by planned gigawatts alone:

  • Capacity stage: distinguish operating facilities from projects under construction and those merely planned.
  • Power access: assess grid availability, power prices and expected connection time.
  • Demand evidence: examine take-up, preleasing and vacancy, while keeping colocation measures distinct from self-build capacity.
  • Site and policy conditions: consider land availability, construction costs, infrastructure readiness and regulatory certainty.
  • Customer mix: identify whether demand is coming from hyperscalers, cloud providers, AI workloads or neocloud providers.
  • Delivery record: compare announced pipelines with capacity that has actually reached operation.

JLL’s forward-supply, preleasing and grid-wait indicators, APREA’s Cushman & Wakefield market snapshot, and CBRE’s and Cushman & Wakefield’s discussion of execution constraints address different parts of this comparison. Their measures are useful inputs, but source definitions should be checked before making a cross-city ranking.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.